Original source · versioned page text
2020-07-16-sm-agenda-item-1-attachment-5-final-noosa-plan-2020-part-8-10-schedules-appendix
Plans and drawings: the text below has words only, no drawings.
Very large file (19.9 MB): may take a few minutes to open.
Figure AP3 8A Primary Active Frontages Figure AP3 9A Gross Floor Area (GFA) Site Cover NOOSA PLAN 2020 Page 13 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.