Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Editor's Note—The Planning Act 2016 and Planning Regulation 2017 allow for native forest timber production authorised under the Forestry Act 1959
 and the Vegetation Management Act 1999 to generally be conducted without being subject to the provisions of a planning scheme.

  Table 8.2.2.3 ­ Criteria for assessable development
  Performance outcomes                                                    Acceptable outcomes
  Ecologically important areas
  PO1                                                                     AO1.1
  Development is sited and designed to protect the physical and           Ecologically important areas are conserved or improved to ensure
  ecological integrity and biodiversity of ecologically important areas   their ongoing contribution to the natural resources and biological
  through protection of:                                                  diversity of Noosa Shire.
  (a)    existing habitat areas and ecological linkages; and
                                                                          AND
  (b)    existing riparian vegetation, waterways and wetland habitat
         values.
                                                                          AO1.2
                                                                          Buildings, structures and associated works are located within
                                                                          existing cleared areas or areas of lowest ecological value.

                                                                          AND

                                                                          AO1.3
                                                                          Where constructing a dwelling house or community residence,
                                                                          buildings and associated structures are not located on land
                                                                          identified as an area of biodiversity significance on a Biodiversity,
                                                                          Waterways and Wetlands Overlay Map.

                                                                          or

                                                                          Clearing vegetation (other than for a driveway access) does not
                                                                          extend beyond—
                                                                          (a)    30 metres of a building or 10 metres of a class 10a
                                                                                 structure on lots greater than 10 hectares; or
                                                                          (b)    10 metres of a building or class 10a structure on lots 10
                                                                                 hectares or less but more than 3,000m2; or
                                                                          (c)    3 metres of a building or class 10a structure on lots
                                                                                 3,000m2 or less.

                                                                          AND

                                                                          AO1.4
                                                                          Clearing of vegetation for a boundary fence does not extend
                                                                          beyond 5 metres either side of the fence.


 Reconfiguring a lot             Table 8.2.2.3 ­ Criteria for assessable development (part)
  Performance outcomes                                                    Acceptable outcomes
  Reconfiguring a lot
  PO2                                                                     AO2
  New lots are only created if they maintain ecological linkages and      Where clearing vegetation for the purpose of Reconfiguring a Lot:
  minimise the clearing of vegetation.                                    (a)    new boundaries to lots do not transect and fragment
                                                                                 existing native vegetation;
                                                                          (b)    new lots are created to allow for suitable building
                                                                                 envelopes for future buildings and works to be located
                                                                                 within existing cleared areas or areas of low ecological
                                                                                 value;
                                                                          (c)    building envelopes are designated for each lot; and
                                                                          (d)    ecological linkages and ecologically important areas are

NOOSA PLAN 2020                                                                                                                          Page 4 of 44
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.