Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
residences and shortterm accommodation (for holiday homes) residences are anticipated in the Low density residential zone,
are located where they: Rural residential zone and Rural zone.
(a) provide a high level of comfort and amenity for occupants;
AO1.2
(b) maintain amenity and privacy of neighbouring premises;
Rooming accommodation provides housing choice within urban
(c) are compatible with the character and streetscape of the boundaries.
local area; and
(d) do not occupy land intended for higher density living.
Effects of Use 9.3.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Effects of Use
Removal homes
PO2 AO2.1
A removal home— Any part of a removal home that is affected by termite attack,
(a) does not have an adverse impact on the amenity of the borers, dry rot or severe weathering or is damaged as a
premises or surrounding premises; and consequence of relocation, is repaired or replaced using new or
sound secondhand materials.
(b) maintains the safety of people and property.
AO2.2
Where located within the urban boundary, external surfaces of the
building are cleaned and painted.
Editor’s Note— the urban boundary is indicated on the zone
maps contained within Schedule 2.
Editor’s Note— applicants will be required to pay a performance
bond to Council before final building approval is granted. The
bond is held by Council until all external building works are
completed to a satisfactory level, usually within a 12 to 24 month
time frame.
Housing choice
PO3 AO3
A secondary dwelling: A secondary dwelling:
(a) forms part of a dwelling house and is not subdivided from (a) has a maximum gross floor area of 65m²;
the balance of the dwelling house; (b) has no more than 2 bedrooms;
(b) contributes to housing choice for members of the one (c) does not occur on any property covered by a Building Unit
household; Plan; and
(c) protects the low density residential, rural residential or rural (d) does not occur on a property that already contains a dual
character of the zone; occupancy or secondary dwelling.
(d) does not occur on a property covered by a Building Unit
Plan or any property already containing more than one
dwelling;
(e) is accompanied by sufficient car parking.
PO4 AO4
Rooming accommodation is located on a site with convenient Rooming accommodation provides housing choice within urban
access to employment or education as well as goods and boundaries is limited to sites within:
services including public transport. (a) 1,500 metres walking distance, via a sealed pathway, of
land within the Major centre zone, District centre zone or
800 metres of land within the Neighbourhood centre zone;
or
(b) 800 metres walking distance, via a sealed pathway of a
pedestrian access point of a hospital or tertiary education
NOOSA PLAN 2020 Page 3 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.