Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix
The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
(a) the site gains access from part of the major road network;
or
(b) more than 10 guests are accommodated—
vehicle manoeuvring areas are provided on site such that vehicles
enter and leave the site in a forward gear.
PO12 AO12.1
Sufficient onsite car parking is provided to accommodate the Visitor car parking spaces are:
number and type of vehicles likely to be generated by the visitor (a) accessible at all times;
accommodation having regard to the number of guests, staff or
(b) not located behind locked gates; and
visitors.
(c) not located in tandem with a garage or other car parking
space
AO12.2
Short term parking is provided near the office to allow for checkin
and checkout.
Editor’s Note— the rate of car parking required is addressed in
Part 9.4.1 Driveways and Parking Code
PO13 AO13.1
Visitor accommodation is provided with a level of infrastructure Visitor accommodation is:
and services that: (a) connected to the reticulated sewer infrastructure network; or
(a) is appropriate to its location and setting; (b) where not located in a sewered area, the premises are
(b) maintains environmental and public health; and connected to an onsite effluent treatment and disposal
(c) is commensurate with the needs of users. system.
Editor’s Note—the Plumbing and Drainage Act 2003 sets outs
requirements for onsite effluent treatment and disposal.
AO13.2
Visitor accommodation is:
(a) connected to the reticulated water supply infrastructure
network; or
(b) where reticulated water supply is not available, provided
with an alternative drinking water supply source (e.g.
rainwater) that complies with the Australian Drinking Water
Guidelines (NHMRC,2011)
Tourist Parks (including camping grounds) Table 9.3.5.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Tourist Parks (including camping grounds)
PO14 AO14.1
The tourist park is of a size and layout that ensures: Any free standing or transportable accommodation building or
(a) it can accommodate the intended use, having regard to structure (including cabins or villas) has a maximum gross floor
varying styles and sizes of accommodation; area of 90m2 and does not include facilities for washing clothes.
(b) caravans and recreational vehicles can be easily
manoeuvred onto or removed from sites;
AO14.2
(c) adequate separation is provided between occupants of Outside the urban boundaries:
sites and property boundaries to ensure visual and site density does not exceed five camping or caravan sites
(a)
acoustic privacy for occupants; and per hectare; and
NOOSA PLAN 2020 Page 27 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.