2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance Outcomes                                               Acceptable Outcomes
  Bushfire Hazard Overlay Map in Schedule 2 and not in a water       supply, the premises has:
  service area, an adequate, reliable, safely located and freely     (a)   an accessible dam, swimming pool or water tank available
  accessible water supply is provided for fire fighting purposes,          for firefighting purposes with an onsite water volume of not
  which is in addition to day to day water supply.                         less than 5,000 litres; and
                                                                     (b)   a water supply outlet pipe 50 millimetres in diameter and
                                                                           fitted with a standard fire brigade fitting connected to the
                                                                           water supply (other than where the water supply is in a
                                                                           swimming pool or dam).

                                                                     Editor’s Note — Water supply capacity for firefighting purposes is
                                                                     in addition to water supply capacity for household use.
  Flood Hazard Area
  PO15                                                               AO15.1
  Where located in the Flood Hazard Area as shown on Flood           The finished floor level of habitable rooms is at least 300
  Hazard Overlay Map in Schedule 2 the development is designed       millimetres above the Defined flood event (DFE).
  and sited to ensure risk to people and property from flooding is
  avoided or minimised.                                              OR

                                                                     AO15.2
                                                                     Where the DFE has not been modelled for the area, the finished
                                                                     floor level of habitable rooms is at least 500 millimetres above the
                                                                     highest recorded flood.

                                                                     Editor's note—The QDC mandatory provisions MP3.5 also apply
                                                                     to the construction of buildings in flood hazard areas.
  Landslide Hazard Area
  PO16                                                               AO16.1
  Development maintains the safety of people, property and           Development, including associated access, is not located on land
  hazardous materials stored in bulk from the risk of landslide.     identified as a landslide hazard area on a Landslide Hazard
                                                                     Overlay Map.

                                                                     AO16.2
                                                                     Development, including associated access, is located outside
                                                                     moderate, high and very high landslide hazard areas and areas
                                                                     with 15% slope or greater, as determined by a site­specific slope­
                                                                     analysis.

                                                                     Editor's Note—A site­ specific geotechnical assessment may be
                                                                     used to demonstrate that although the proposed development is
                                                                     shown on the Landslide Hazard Overlay as being in the moderate,
                                                                     high or very high landslide hazard area, the landslide risk is low or
                                                                     very low

                                                                     AO16.3
                                                                     A site­specific geotechnical assessment is prepared by a
                                                                     registered professional engineer to certify that:
                                                                     (a)   the stability of the site, including associated buildings and
                                                                           infrastructure, will be maintained and operational for the life
                                                                           of the development;
                                                                     (b)   the site is not subject to the risk of landslide activity
                                                                           originating from other land, including land above the site;
                                                                           and
                                                                     (c)   development of the site will not increase the risk of
                                                                           landslide activity on other land.

                                                                     Editor's Note— PSP8 Natural Hazards provides further guidance


NOOSA PLAN 2020                                                                                                                Page 37 of 150
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 5 - Final Noosa Plan 2020 Part 8-10 Schedules & Appendix(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.