Log in to see the plans as drawn Bushfire management Table 8.2.2.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Bushfire management
PO12 No acceptable outcome provided
Bushfire management measures are adopted based on
ecological principles, which:
(a) maintain and enhance biodiversity;
(b) minimise threat of fire to the natural environment, as well
as life and property; and
(c) provide for effective use and maintenance of buildings and
structures.
Editor's note—The performance outcome applies to properties in
bushfire hazard areas and only where clearing is reasonably
necessary for the control of bushfire risk to a building or
structure. Bushfire hazard areas are shown on Bushfire Hazard
Overlay maps in Schedule 2.
Scenic amenity Table 8.2.2.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Scenic amenity
PO13 AO13.1
The scenic amenity and vegetated character of the landscape Vegetation is retained:
is protected by retaining vegetation: (a) on and within 30 metres of prominent ridgelines and on
(a) along and around watercourses and drainage lines; sloping sites;
(b) on steep slopes and ridgelines; (b) in gullies;
(c) along the major road network; and (c) along watercourses and drainage lines;
(d) that forms coastal vistas to and from beaches. (d) within 10 metres of the major road network; and
(e) along the front coastal dune system.
8.2.3 Bushfire Hazard Overlay Code
8.2.3.1 Application
(1) This code applies to assessable development:
(a) subject to the Bushfire Hazard Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
(b) identified as requiring assessment against the Bushfire Hazard overlay code by the tables of assessment in Part 5 (Tables
of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
Editor's note—Planning scheme policy 9 for assessment of natural hazards provides guidance on preparing bushfire hazard
assessments and mitigation reports.
8.2.3.2 Purpose and overall outcomes
(1) The purpose of the Bushfire Hazard overlay code is to ensure that development avoids or mitigates the potential adverse impacts
of bushfire on people, property, economic activity and the environment.
(2) The overall outcomes sought for the Bushfire Hazard overlay code are:
NOOSA PLAN 2020 Page 9 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.