Council archive · source document
Attachment D - Stormwater Management Plan · 132008.175.04
Plans and drawings: the text below has words only, no drawings.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
W
9
SE
.5
W
RE
12
TE
LEGEND:
.8 1
NI D
3
TY
.6
12
CL
12
W
W
OS D
PROPOSED LIGHT DUTY CONCRETE
E
2
T
E PAVEMENT AREA
2 .5
13
.512
8
.9
12
PROPOSED CONCRETE 'B'
12
PROPOSED TYPE 'B' INTEGRAL KERB
W COMMERCIAL DRIVEWAY. IN MH
T
ACCORDANCE WITH IPQEAQ STD 'B3'
W
E PROPOSED TYPE 'B3' INTEGRAL KERB
.5
8
DRG RS-051 S
0
13
W
13.
18
T
RL
MH E PROPOSED DRAINAGE NETWORK
RL
.
13
3
S
.2
W
E
T
S
13
E
69
.2 L13.20
53
PROPOSED TOP OF BATTER
4
| | | | | | | | | | | | | |
.0
W
3.
8
W
3.
S
14
.2
PROPOSED TOE OF BATTER
251
E
0 1
13 R
6
97
13
33
.50
13. .
RL 5
W
33
13.
R1L3
S PROPOSED DESIGN SURFACE LEVEL
E
RL
14
.7
.
6.2m
13
S
13
W FINISHED SURFACE CONTOUR
E
50
2
S E
.5
13.
EXISTING SURFACE CONTOUR
13
RL
5
.6 PRPO
ROP
.4
5
55
13
S E/OH EXISTING OVERHEAD ELECTRICAL
13 PERERT E
8
13
TY YB BO
13.
.
6
OUNUND
14
E/UG EXISTING UNDERGROUND ELECTRICAL
S L
.1
DARARY
R
S Y
14
T EXISTING TELSTRA RETICULATION
9
5
5%
.9
.5
.9
13 D EXISTING STORMWATER DRAINAGE
13
MA
13.5
5% MA
12
S
75
6
X
X
.7
13.
0
A
W EXISTING WATER RETICULATION
9
.1
2 0
13
m
3
.8
5
MH
RL
.6 L13.5
2.4
R0
13
.4
87
14 7.5
S EXISTING SEWER RETICULATION
.57
13
m
3.
.4
14 R
EXISTING GAS MAIN
13
G
13
3m
1
13.6
RL
m
EXISTING TREE
85
2.4
5
13.4
13.
3
9
136.
5.4
RL.9
MA 8
.9
RL
m
1 IN
13
X
12
.25
8
.7
3
8
13
.3
89
'B'
.0
13
RL
.63.50
4
14
13.
15
5
.2
ALL KERB, KERB & CHANNEL,
RL
2
1R3L1
12
3
.4
.2
.813.10
13
WHEELSTOPS & BOLLARDS TO
14
0
.1 6.1
5
13RL
BE PAINTED "SAFETY YELLOW"
15
m
12
15
5.5
.
14
m 1
9
184 RAM 'B3'
.7
.4
3
13
1
6
P1
.3
AX
7
13
.3
5M
1
5
'
.1
11
'B3
IN9
.3
1.1
15
13
3
.3
.1
13
14
LINE OF
6
.2
BUILDING
5
14 RL10.6
13
OVER
14
7 7
4
.2
2
.0 1
.1
0
.3
13
3
0 5.
5
1 1
6
.9 1
1
10.
RL
3
0
0
9 14
MA 8
.2
.5
.1
1 IN
13
.1 4
X
6
13
1R4L10.
0
13
1
.7
7
.8
14
12
0
11
13
.1
4
10.
85
13
7
5
13.
.0
RL
.9
11
RL
12
89
3
.9
13.
0
.2
3
12
RL
.6
12
10
12
8
.2
0
12
.7
12
8
.5
7
9
8
9
12
.9
.3
.9
.8
3
10
12
11
12
.6
0
12
5
.8
.2
4
4
LOT 9
12
3
.1
10
.8
.4
12
11
BASEMENT
12
12
70
8
0 2.0 4.0 6.0 8.0 10.0m
FFL10.40
.5
5
9.
.3
12
1
.4
1
12
2
8
4
.1
13.
12
.2
.8
SCALE 1:100 A1, 1:200 A3
12
12
RL
85
10
13.
RL
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.