Council archive · source document
Attachment D - Stormwater Management Plan · 132008.175.04
Plans and drawings: the text below has words only, no drawings.
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
RIP MANAGEMENT AND MAINTENANCE PLAN
ELEMENT: MAINTENANCE OF RAPID
INFILTRATION PITS (RIP’s)
1. Objective To ensure ongoing function of RIP’s in reintroducing
runoff into the subsoil.
2. Management Strategy RIP to remain free of silt/sediment build-ups.
3. Actions Maintenance contractor to service RIP’s at
monthly intervals.
All removed sediment/silt to be placed in skips or
bins for disposal.
4. Performance Indicators Body Corporate to ensure maintenance schedule
adhered to.
5. Frequency/Deadline Monthly inspections.
6. Responsible Person Body corporate to ensure maintenance schedule
/Organisation adhered to.
Maintenance contractor to make entries in
environmental diary noting date of RIP service,
condition of RIP, material removed and means of
disposal.
Random inspection by Council/EPA officers.
7. Reporting and Review Maintenance Contractor to make entries in
environmental diary noting date of RIP service,
condition of RIP, material removed and means of
disposal.
Random inspection by Council/EPA officers.
8. Corrective Action Review maintenance schedule as appropriate.
Replace BIDIM A14 filter yearly or more regularly
when necessary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.