Council archive · source document
06/2378 - DNR Referral Agency Response [As Published] · 152006.2378
Schedule A — Glossary Clearing as a result of reconfiguring includes: e clearing of assessable vegetation that will result from reconfiguration of the lot(s), consisting of any of the following And clearing for boundary fence lines for each proposed allotment (whether or not the clearing is proposed as part of the application) clearing for infrastructure—including stormwater management systems, water supply and sewerage systems—roads, access routes or utilities corridors that are proposed as part of the RaL application or that will be required as a condition of approval by the assessment manager clearing for excavation and filling—for example, where the lots are to be levelled. « clearing of assessable vegetation that will become exempt if the development . application is approved. This includes any of the following examples clearing for a single residence and reasonably associated buildings and structures for each allotment to be created as a result of the RaL, where no such dwelling house already exists on the proposed allotment all lots will be assessed as including clearing of 2 ha for of the purpose stated in (b)(i), or for lots smaller than 2 ha the whole area of the lot, unless the application demonstrates that a greater or smaller area will be required and achieved—for example, building envelopes binding on title clearing for routine management and essential management purposes associated with the approved development including clearing to maintain proposed infrastructure, facilities, roads, access routes, utilities, services and fences, and clearing to maintain the safety of persons and property that will be associated with the development clearing for necessary fire breaks and fire management lines associated with the development. This will be assessed as follows i. all built infrastructure other than underground services, roads and fences will be assessed as requiring clearing for firebreaks with a width of 1.5 times the height of the tallest vegetation_adjacent to the infrastructure, or 20m, whichever is the greater. However, evidence may be provided to NRW that confirms that an alternative firebreak width is required that is consistent with the State Planning Policy (SPP) 1/03 Guideline ii... all proposed allotment boundaries will be assessed as requiring clearing for fire management lines with a width of 10m constructed on either side of the allotment boundary, unless NRW is provided with evidence that confirms that an alternative width of fire management line is required or an alternative configuration of fire management lines are required that is consistent with the SPP 1/03 Guideline iii. in the case of evidence being presented that demonstrates alternative fire management guidelines as being sufficient and consistent with the SPP 1/03, NRW may condition the development so that the full extent of exempt clearing prescribed for essential management under Schedule 8 of the IPA cannot be carried out by current or future landholders. The Department of Natural Resources and Water IC1106NAM0008 3of3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2378 - DNR Referral Agency Response [As Published]Related documentApplication case desk ↗
About this file
- File size
- 304 KB (small file)
- File type
No other editions are linked here.