Original source · versioned page text
MINOR CHANGE - Attachment 3 - Updated Ecology Advice Gondwana Ecology Group.pdf
• The landscaping proposal uses a mix of suitable native species 5 which will replace the
weed infested areas associated with the existing facility and open space
7.0 Conclusion
An amended (Minor Change) plan has been proposed to address the concerns of Councillors
that the development is (i) excessive and (ii) interferes with ecologically important area and
an environmentally sensitive area.
The Amended Plan of Development has reduced the interference with Council mapped
“Areas of Biodiversity”. The Proposed Development caused the impact to 1562m2 of mapped
area, while the Amended Plan causes a reduced extent of 1182m2 of the mapped area to be
disturbed.
From an ecological perspective the proposed changed plans are a positive ecological
improvement. The previously proposed environmental outcomes remain and will ensure an
acceptable ecological outcome, generating a net benefit. In terms of planning, the change
while positive, would be considered a minor change, as it –
• does not cause any new impacts, nor
• does it exacerbate any existing/proposed impacts.
Please do not hesitate to give me a call on 0407 410 099 if you need to discuss further.
Kind regards
Justin Watson (PhD; CEnvP.)
Director/Principal Ecologist
Gondwana Ecology Group
Encl.
• ATTACHMENT A – Subject Land (Aerial)
• ATTACHMENT B – Proposed Development (Current)
• ATTACHMENT C – Amended (Minor Change) Development (2025)
• ATTACHMENT D – Comparison of Impact Area (Biodiversity Overlay)
Note: refer Marchese Partners for original set of plans
5
Which are consistent with the bushfire protection/management requirements.
[OCR of page images]
e The landscaping proposal uses a mix of suitable native species® which will replace the
weed infested areas associated with the existing facility and open space
7.0 Conclusion
An amended (Minor Change) plan has been proposed to address the concerns of Councillors
that the development is (i) excessive and (ii) interferes with ecologically important area and
an environmentally sensitive area.
The Amended Plan of Development has reduced the interference with Council mapped
“Areas of Biodiversity”. The Proposed Development caused the impact to 1562m? of mapped
area, while the Amended Plan causes a reduced extent of 1182m7? of the mapped area to be
disturbed.
From an ecological perspective the proposed changed plans are a positive ecological
improvement. The previously proposed environmental outcomes remain and will ensure an
acceptable ecological outcome, generating a net benefit. In terms of planning, the change
while positive, would be considered a minor change, as it —
e does not cause any new impacts, nor
e does it exacerbate any existing/proposed impacts.
Please do not hesitate to give me a call on 0407 410 099 if you need to discuss further.
Kind regards
Justin Watson (PhD; CEnvP.)
Director/Principal Ecologist
Gondwana Ecology Group
Encl.
e ATTACHMENT A - Subject Land (Aerial)
e ATTACHMENT B - Proposed Development (Current)
e ATTACHMENT C - Amended (Minor Change) Development (2025)
e ATTACHMENT D - Comparison of Impact Area (Biodiversity Overlay)
Note: refer Marchese Partners for original set of plans
5 Which are consistent with the bushfire protection/management requirements.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.