Council archive · source document
Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
c) kerb and channel a) sealed shoulders;
i. controls vehicle movement by delineating b) wide kerbside lane;
the carriageway for all users; c) exclusive or peak period bicycle lane;
ii. conveys road pavement run-off to d) advisory treatments such as Bicycle Awareness
stormwater drainage in a manner that allows Zone;
the road to be trafficable in Q100 ARI local e) shared parking / bicycle lane;
rainfall events; and f) contra flow bicycle lane; and
g) bus/bicycle lane.
d) verges and footpaths provide
i. safe access for pedestrians and cyclists clear S5.4 No new bicycle lanes are proposed as part of the
of obstructions; The provision of bicycle lanes at intersections is development.
ii. an access area for vehicles onto properties; generally in accordance with AUSTROADS Part
iii. a corridor allocated for services and utilities; 14, section 5 and the Manual of Urban Traffic Control
and Devices (MUTCD) Part 9.
iv. additional amenity for minor roads.
O6 S6.1 Complies with probable solution.
Stormwater drainage infrastructure is planned, Stormwater drainage planning, design and Stormwater drainage planning, design and
designed and constructed to ` construction is in accordance with Section 4 of construction will be in accordance with Section 4
a) be accessible, cost effective and easily PSP5 Engineering Design Standards Roads, of Noosa PSP5 Engineering Design Standards
maintainable; Drainage and Earthworks; Roads, Drainage and Earthworks; Analysis
b) protect downstream capacity; AND prepared in the Bayview Noosa Hydrology and
c) protect downstream water quality; Stormwater Management Plan prepared by WBM
d) maximise on-site stormwater retention and S6.2 Oceanics Australia clearly shows that the peak
retardation; and As Constructed data is submitted in accordance discharge from the site is reduced as a result of
e) convey run-off to stormwater drainage in a with Section 6 of PSP5 Engineering Design development on the site. Whilst the building types
manner that allows roads to be trafficable in Standards Roads, Drainage and Earthworks; for the new development proposal have altered,
Q100 ARI local rainfall events. AND the impervious area created by the development
(roads, paths and roofs) is less than that created in
S6.3
the previously approved development proposal.
Stormwater drainage planning, design and
construction is in accordance with the Queensland
Urban Drainage Design Manual.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Transport, Roads and Drainage Code 11 April 2006 Page 106
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.