Council archive · source document
Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES ACCEPTABLE SOLUTIONS (if self-assessable)
PROBABLE SOLUTIONS (if code assessable)
Dams
O10 S10.1 Complies with specific outcome.
Dam location and construction does not impact No solution provided. No new dams are proposed within the
upon neighbouring properties in terms of development.
a) hydrology;
b) alteration of existing overland flowpaths and
patterns;
c) landslide or failure of dam wall; and
d) effluent disposal areas.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Earthworks Code 11 April 2006 Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.