Council archive · source document
Volume 2 - Code Responses · 132006.823
8.0 EXISTING SERVICES CODE
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS (if code assessable)
Setbacks and easements
O1 S1.1 Complies with specific outcome.
Development near a sewer, water main, stormwater The footing of any structure or building is located The development of Stage 3 Viridian does not
drain, overland flow path or associated clear of the zone of influence but no closer than 1.5m require any buildings to be located near a Council
structure does not (measured horizontally) from infrastructure sewer, watermain, stormwater drain or associated
a) adversely affect the function of the service; including sewers, water mains and stormwater structure.
b) place an additional load on the service; and structures;
c) unduly increase future maintenance costs. AND
S1.2
No building or structure overhangs the zone of Q Block balconies which overhang the sewer do
influence; not:
AND (a) adversely affect the function of the service;
(b) place an additional load on the service;
S1.3 (c) unduly increase future maintenance costs;
Finished surface levels maintain a minimum of by providing a 4.5 metre clearance.
600mm of cover, but no greater than 3m of cover
to the underground infrastructure;
AND
S1.4
If the existing surface level is altered, surface level
services including manholes and inspection points
are altered to match the new surface level;
AND
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Existing Services Code 11 April 2006 Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.