Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                         COLUMN 1                                   COLUMN 2                                             ASSESSMENT
               SPECIFIC OUTCOMES                  PROBABLE SOLUTIONS (if code assessable)
Local amenity
O4                                              S4.1                                                     Complies with probable solutions.
Earthworks do not cause disturbance to the      The following control measures are implemented           Development proposal complies with prescribed
amenity of the neighbouring land.               a) regular water spraying of exposed areas to            solution. The main access road within the site,
                                                   suppress dust;                                        Alma Way, is sealed. The site of the works is well
                                                b) provision of dust stabilised or sealed internal       away from other properties with more than 70m
                                                   roads;                                                clearance to all neighbours except Stage 2 of the
                                                c) protective covering of exposed areas that are left    Viridian development.
                                                   for more than 2 weeks; and
                                                d) if there is no valid development permit for the       The contractor will be required to -
                                                   site, disturbed areas are revegetated using species          Suppress dust by watering and stabilising
                                                   identified in PSP3 Landscaping Plants and                    disturbed areas
                                                   Guidelines.                                                  Remove waste by licensed contractors
                                                AND                                                             Undertake works within the prescribed
                                                                                                                hours of work.
                                                S4.2
                                                Earthworks are undertaken only during the hours of
                                                7am to 6pm, Monday to Friday and 7am to 6pm on
                                                Saturday. No work is undertaken on Sunday or
                                                public holidays.
Vegetative Waste
O5                                              S5.1                                                     Complies with probable solutions.
Vegetation cleared from a development site is   Cleared vegetation is transported offsite for disposal   Cleared vegetation is to be mulched on-site and
disposed of in an environmentally responsible   in an approved green waste disposal facility;            reused for landscaping of the finished
manner.                                         OR                                                       development.

                                                S5.2
                                                Cleared vegetation is mulched on-site and reused for
                                                landscaping of the finished development;
                                                OR


                                                                                                                                         Volume II: Code Responses

                                                                                                                                         Viridian Noosa Project
                                                                                                                                         Viridian Stage 3

Existing Services Code                                                                                                                   11 April 2006     Page 40

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.