Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Volume 2 - Code Responses · 132006.823

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                         COLUMN 1                                            COLUMN 2                                  ASSESSMENT
               SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS (if code assessable)
Environmental protection
O9                                                         S9.1                                        Complies with specific outcome.
Earthworks minimise any adverse impact upon                No solution provided.                       Erosion and sediment control devices will
groundwater, watercourses, drainage lines, wetlands, and                                               minimise any adverse effects of construction on
native vegetation.                                                                                     water quality, effectively protecting downstream
                                                                                                       watercourses, native vegetation, drainage lines and
                                                                                                       groundwater during the construction period.
                                                                                                       Water quality will be enhanced after the
                                                                                                       completion of construction, as the proposed
                                                                                                       development of the original Viridian site
                                                                                                       incorporates significant revegetation of the
                                                                                                       property. A GPT device will be incorporated on
                                                                                                       all drainage lines, together with an oil and grease
                                                                                                       arrester on drainage from car park areas prior to
                                                                                                       discharge to the drainage line running through the
                                                                                                       site.

                                                                                                       Earthworks will have no adverse effect on
                                                                                                       watercourses, drainage lines, wetlands, and native
                                                                                                       vegetation, in a physical sense, as the extent of
                                                                                                       earthworks is well clear of any of these features.
Dams
O10                                                        S10.1                                       Complies with specific outcome.
Dam location and construction does not impact              No solution provided.                       No new dams are proposed within the
upon neighbouring properties in terms of                                                               development.
a) hydrology;
b) alteration of existing overland flowpaths and
   patterns;
c) landslide or failure of dam wall; and
d) effluent disposal areas.


                                                                                                                                        Volume II: Code Responses

                                                                                                                                        Viridian Noosa Project
                                                                                                                                        Viridian Stage 3

Existing Services Code                                                                                                                  11 April 2006     Page 43

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Volume 2 - Code Responses.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.