Council archive · source document
Volume 2 - Code Responses · 132006.823
COLUMN 1 COLUMN 2 ASSESSMENT
SPECIFIC OUTCOMES PROBABLE SOLUTIONS
vi. are located on public land or within access
easements that are granted in favour of
Noosa Shire Council and the Queensland
Fire and Rescue Service33.
Road network
O12 S12.1 Complies with specific outcome.
Roads provide for the safe and effective Culs-de-sacs or no-through roads are not used in The Stage 3 design has roads/lanes which act as a
evacuation of users of premises and access the street network unless buffer between the buildings and bushland areas.
by Emergency services. a) a perimeter road reserve with a minimum
reserve width of 20m and a formed width of Existing tracks within adjacent bushland areas and
not less than 6m is provided; or cul-de-sacs or on site will remain open to allow vehicular access
no-through roads are provided with fire trails or in case of fire.
access easements, capable of being navigated by
conventional vehicles, that link to through
roads (see Figure 13.3 and Figure 13.4);
AND
S12.2
Roads have a maximum grade of 12:5% (1:8).
Lot design
O13 S13.1 Complies with the specific outcome.
Lot design and building siting minimises Each lot includes a building envelope, identified on The design has roads/lanes which act as a buffer
bushfire hazard to people and property having the plan of subdivision between the buildings and bushland areas thereby
regard to slope, aspect, existing vegetation a) f sufficient size and dimensions to separating buildings from vegetation
and adequate separation from hazardous accommodate a dwelling and ancillary
vegetation. buildings and use areas; and The construction area is generally flat and
b) or lots more than 2,500m landscaping will contain moist vegetation.
i. conforming with the principles for house
site number 1, 2 or 3 shown in Figure The development is proposed for the base of a
13.5 north facing slope which indicates the
ii. house sites in bush fire hazard areas; and development is in a relatively safe position. As per
Figure 13.5 of this code.
Volume II: Code Responses
Viridian Noosa Project
Viridian Stage 3
Natural Hazards Overlay Code 11 April 2006 Page 65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Volume 2 - Code ResponsesRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.