Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-03-21 Ordinary Meeting Agenda

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                              21 MARCH 2019


Requested Motion
That Council note the report to the Planning and Environment Committee Meeting dated 12 March
2019, the further report to the General Committee Meeting dated 18 March 2019 and the further
report to the Ordinary Meeting dated 21 March 2019 by the Manager Development Assessment
regarding a request for a Negotiated Decision Notice for Application No. MCU18/0102 for a
development approval for Visitor Accommodation - Type 4 Conventional situated at 14-16 Mary
Street, Noosaville and:
A.   Refuse to change condition 3d for the following reasons:
     1.    Conditions 3d and 36 are required and warranted due to the site’s proximity to residential
           properties.
     2.    Conditions 3d and 36 are required to mitigate noise for nearby residents and complement
           and support other conditioned noise management strategies for the backpackers.
B.   Agree to change conditions 36, 52 & 64 as follows:
     36.   Speakers located in outdoor areas of the site must be selected to be low power, installed
           as a distributed speaker system and controlled from a central volume control unit
           accessible to staff only and fitted with an electronic noise limiter such that speakers do
           not operate at noise levels which exceed 75 dB(C) at 3 metres from the source at any
           time. Speakers must be located and oriented such that they are not be directed towards
           off-site residential areas. There is to be no live entertainment on site.
     52.   The site must be provided with a stormwater drainage system connecting to a lawful
           point of discharge. The works must be undertaken in accordance with an Operational
           Works approval and must include in particular:
           a.     the works shown on drawing number 17699-SK101 Revision A prepared by TOD
                  Engineers and Project Managers dated 17 August 2018, with the inclusion of the
                  following:
                  i.    The storage tank must have sufficient capacity to cater for the runoff from the
                        driveway in a 5 minute 1%AEP rain event as a minimum.
                  ii.   The basement structures (walls, floors and surfacing) must be constructed
                        of materials suitable for the potential inundation and all service connections
                        must be located a minimum of 300mm above the potential inundation level.
     64.   Noise levels from on-site activities, including guests must not exceed the following levels.
           i.     7am to 6pm = 46 dB(A) LAeq,adj,T;
           ii.    6pm to 10pm = 40 dB(A) LAeq,adj,T;
           iii.   10.00pm to 7.00am = 35 dB(A) LAeq,adj,T
C.   Agree to delete condition 63
D.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


Consultation
External Consultation - Community & Stakeholder
MWA Environmental




                                                                                       Page 17 of 19
Log in to download the original file

2019-03-21 Ordinary Meeting Agenda(PDF, 588KB).pdf · 602 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.