DDD
1.6 Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?
[8J No
.. This application requires assessment by the Department.of Transport and Main Roads as a
DYes concurrence agency
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, item 14
1.7 Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?
[8J No
. This application requires assessment by the Department of Transport and Main Roads as a
DYes concurrence agency
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, item 15
1.8 Is any part of the premises in an interim koala habitat protection area identified under the South East
Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?
[8J No
DYes . It is recommended that you complete part 5 of this checklist.
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
also assessable?
[8J No
DYes . It is recommended that you complete part 6 of this checklist.
1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation?
[8J No
DYes . It is recommended that you complete part 7 of this checklist.
1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3)or (5),
or from a dam constructed on a watercourse or lake?
[8J No . It is recommended that you complete part 8 (starting from question 8.8) of this checklist.
DYes . It is recommended that you complete part 8 (starting from question 8.1) of this checklist.
1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 2009?
[8J No
DYes . It is recommended that you complete part 9 of this checklist.
Operational works IDAS checklist 4
-
Version 1.0 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4Related documentApplication case desk ↗
About this file
- File size
- 16.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.