Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4 · OPW12/0095

of 23

Text shows just the words. Original shows the document exactly as it was published.

Very large file (16.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

DDD
1.6      Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
         2009 and does it exceed the specified threshold?


[8J No
            ..       This application requires assessment by the Department.of Transport and Main Roads as a
DYes                 concurrence agency



Section reference:
.        Sustainable Planning Regulation 2009, schedule 7, table 3, item 14


1.7      Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
         2009 and does it exceed the specified threshold?


[8J No
            .        This application requires assessment by the Department of Transport and Main Roads as a
DYes                 concurrence agency



Section reference:
.        Sustainable Planning Regulation 2009, schedule 7, table 3, item 15


1.8      Is any part of the premises in an interim koala habitat protection area identified under the South East
         Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?


[8J No
DYes        .        It is recommended that you complete part 5 of this checklist.


1.9      Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
         also assessable?


[8J No
DYes         .       It is recommended that you complete part 6 of this checklist.


1.10     Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
         clearing of native vegetation?

[8J No
DYes         .       It is recommended that you complete part 7 of this checklist.


1.11     Is any of the proposed operational work for any thing constructed or installed that allows, under the
         Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
         using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3)or (5),
         or from a dam constructed on a watercourse or lake?




[8J No       .       It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

DYes         .       It is recommended that you complete part 8 (starting from question 8.1) of this checklist.


1.12     Is any of the proposed operational work tidal work, other than excluded work defined under the
         Sustainable Planning Regulation 2009?


[8J No
DYes         .       It is recommended that you complete part 9 of this checklist.




                                                                                      Operational works IDAS checklist 4
                                                                                                        -




                                                                                              Version 1.0 December 2009

Used in these records

About this file

File size
16.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4.pdf · 16.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.