Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4 · OPW12/0095

of 23

Text shows just the words. Original shows the document exactly as it was published.

Very large file (16.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

DDD
IPart 3 Acid sulfate soils
            -




3.1        Is the natural ground level of any point where work is being carried out less than 20 metres
           Australian Height Datum (AHD)?


DNo             .      End of part 3 of this checklist.

I:8J Yes

3.2        Does the proposed operational work involve the following?


excavating more than 1000 cubic metres of soil or sediment at or below five metres
                                                                                        DYes            [8J No
AHD

using more than 1000 cubic metres or more of material with an average depth of 0.5
                                                                                        DYes            [8J No
metres on land, soil or sediment at or below five metres AHD


.          If yes to any of the above, then this application requires assessment by the Department of Environment and
           Resource Management as an advice agency.


Section reference:
.          Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
.          State planning policy 2/02: planning and managing development involving acid sulfate soils, section 3.6



Ipart 4 Easements and Substations
            -




4.1        Is the filling or excavation associated with reconfiguring a lot?




~Yes I.
IONO                   Go to question 4.5


4.5        Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
           1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
           strategic pipeline?


I:8J No         .      End of part 4 of this checklist.

DYes            .      This application requries assessment by the pipeline licence holder as an advice agency.


Section reference:
.          Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17


IPart 8 Taking or inte ering with water
            -




                                                                                       Operational works IDAS checklist 4
                                                                                                        -




                                                                                                Version 1.0 December 2009

Used in these records

About this file

File size
16.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4.pdf · 16.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.