Plan No. Rev. Plan/Document Name Date
7043-DA26 04 FINISHES PALETTE / SCHEDULES by Blackburne 12-10-17
Jackson Design
7043-DA28 04 FIRE AND EVACUATION MANAGEMENT PLAN by 26-06-17
Blackburne Jackson Design
7043-DA30 04 HEIGHT PLAN PROJECTIONS by Blackburne Jackson 12-10-17
Design
7043-DA31 12 HEIGHT PLAN PROJECTIONS by Blackburne Jackson 12-10-17
Design
7043-DA40 02 HEIGHT PLAN PROJECTIONS ABOVE PROPOSED 12-10-17
FINISHED GROUND by Blackburne Jackson Design
7043-DA50 01 SITE MAINTENANCE SHED: PLAN, ELEVATION & 12-10-17
SECTION by Blackburne Jackson Design
7043-DA102 08 SITE MAINTENANCE SHED LANDSCAPING by 12-10-17
Blackburne Jackson Design
7043-DA104 08 BLOCK 25: LANDSCAPING by Blackburne Jackson 12-10-17
Design
7043-DA105 08 BLOCKS 23 & 24: LANDSCAPING by Blackburne Jackson 12-10-17
Design
7043-DA106 08 BLOCK 24 & CORNER LANDSCAPING by Blackburne 12-10-17
Jackson Design
7043-DA107 07 PLANT SPECIES PALETTE & HARDSCAPE MATERIALS 12-10-17
by Blackburne Jackson Design
7038-DA13 07 Overall Staging Plan by Blackburne Jackson Design 14-06-17
DD1.3 H SITE PLAN by Sparks Architects 27-06-17
DD1.15 G GROUND FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.16 G FIRST FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.17 F ROOF FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.18 G GROUND FLOOR PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.19 G FIRST FLOOR PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.20 F ROOF PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.21 G GROUND FLOOR PLAN BLOCK 12 by Sparks Architects 27-06-17
DD1.22 G FIRST FLOOR PLAN BLOCK 12 by Sparks Architects 27-06-17
DD1.23 F ROOF PLAN BLOCK 12 by Sparks Architects 27-06-17
WD2.8 B ELEVATIONS BLOCK 10 by Sparks Architects 23-08-17
WD2.9 B ELEVATIONS BLOCK 11 by Sparks Architects 23-08-17
WD2.10 B ELEVATIONS BLOCK 12 by Sparks Architects 23-08-17
3. The approved development comprises a total of 1 x 2 bedrooms and 28 x 3
bedroom units.
13. External colours and finishes of the building must comprise of muted
environmental tones that blend with the natural environment, as indicated on
approved plan DA26 “Finishes Palette / Schedule” by Blackburne Jackson
Design. Buildings 23, 24, and 25 must not contain broad areas of light coloured
walls.
14. Any new boundary fencing along the southern and eastern boundaries must be
constructed to allow for the movement of fauna. Such fencing must:
a. allow adequate clearance at ground level for local macropods;
Page 5 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.