INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA _

 

13

 

 

Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gowai4  L1Yes

If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
CINo

If no, is there a code of environmental compliance under the Environmental Protection Regulation 2008 for every aspect of each
proposed ERA?

oO No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. i the Adiministering Authority is not the
Assessment Manager lor the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
(1 Yes - Gor a1.4

O Yes

If yes, is any extraction ERA intended to be located in waters?
U1 Yes

If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?

o Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessmem Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence

 

 

 

 

Agency.
4 No ~ An application for the ERA will be taken to be not properly made and the Assessment Manager must refuse to receive it.
CNo
If no, is any part of any ERA intended to be located in a high preservation area?
0 Yes
If yes, is each proposed ERA one of the following?
(i) asewage ERA Ld No| (1 Yes
(ii) a water treatment ERA CINo| (1 Yes
(iii) a dredging ERA _ ()No| D1 Yes
{iv) an extraction ERA carried out outside waters and the activity is a borrow pit of not ONo/L Yes

more than 10,000m: for -
* — specified works under the Wild Rivers Act 2005; or
| residential complexes, as defined under the Environmental Protection Act 1994

(v) “a screening ERA carried out outside waters and the activity is for - (CNo|L Yes
« specified works under the Wild Rivers Act 2005, or
+ _ forresidential complexes, as defined under the Environmental Protection Act 1994

(vi) a crude oil or petroleum product storage ERA and the activity is - (no|T Yes
« for residential complexes, as defined under the Environmental Protection Act 1994, &
« carried out outside a designated urban area, as defined under the Wild Rivers Act
2005

(vii) An exempt environmentally relevant activity, as defined under Environmental Protection \(C)No|(_] Yes
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005

If yes to any one of (i) - (vii) above - Unless the application is consistem with any property development plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive x. (Complete Form 1, Part G). This
application requires assessment by the Administering Authority for the purposes of the Environmental Protection Act 1994. ifthe
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Cancurrence Agency. Subject to
any limitations in the declaration for the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild
Rivers Act 2005. In paiticiilar, a sewage ERA, a water treatinent ERA and an ‘exempt environmentally relevant activity’ do not require
assessment for the purposes of the Wild Rivers Act 2005 if the ERA is proposed in a designated urban atea.

 

 

 

 

 

 

 

 

If no to all of (i) - (vii) above - An application for the ERA/s will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
oO No - Answer the following question on the next page

 

Page 3

 

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.