Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 S ECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work. PLANNING SCHEME 44 Is the proposed operational work assessable under any State planning regulatory provisions? No If no, is the proposed operational work assessable under the planning scheme? CINo - Gowas2 Yes - Complete Form 1, Pan E and answer Q4.1.1 - 4.1.7 below OYes If yes, is the proposed operational work assessable under the planning scheme? oO No ~ Answer Q4.7.1- 4.1.7 oO Yes ~ Complete Form 1, Part E and answer (4.1.1 - 4.1.7 below STATE-CONTROLLEDROAD =. ‘ oo aa 444 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? Wo If no, is the proposed operational work for filling or excavating listed in /ntegrated Planning Regulation 1998, schedule § and does‘it exceed the threshold? VIN lo C1 Yes - 7nis application must be referred to the Departinent af Main Roads (DMR) as Concutience Agency. (1 Yes If yes, is all of the proposed operational work associated with either - « — Amaterial change of use that is assessable under the planning scheme; or (Ono OYes « — Reconfiguring a tot that increases the total number of lots, or increases the total number of lots abutting the State-controlled road If no - Answer (a) - (6) below (a) Is any of the proposed operational work associated with access to a State-controlled road? No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. (b) Is any of the proposed operational work for filling or excavation? CI No O Yes oe is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency oO Yes - This application must be referred to DMR as Advice Agency. (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road? CINo Yes \f yes, is the operational work proposed in a future State-controlled road not defined by route? LINo.- tis application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. Oo Yes - This application must be referred to DMR as Advice Agency. IP Regulation, schedule 2, table 3. tem 3; IP Reguiation, schodule 2, table 3, item 1(6).” ACID SULFATE SOILS 412 Is any of the operational work proposed in a local government area listed*1 in State Planning Policy 2/02; Planning and Managing Deyeélopment Involving Acid Sulfate Soils? No -Gowaa73 [1Yes If yes, is the natural ground level of any point where work is being carried out less than 20m AHD? LI No 0 Yes If yes, does the proposed operational work involve the following? (i) Excavating more than 1,000m3 of soil or sediment at or below 5m AHD [No DYes (ii) Filling the premises with 1,000m5 or more of material with an average depth of 0.5m on Ono Des land, soil or sediment at or below 5m AHD If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Waler (NRW) as Advice Agency IP Regulation, schedule 2. table 3, tem 4, State Pleoning Policy 2/02: Pisnning anid Managing Development involving Acid Suitste Soils. section 3.6. 41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumeti, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpeniaria, Cook, Cooloola, Douglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.