Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
4.9 _|Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety [Kio (1 Yes
and Reliability) Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% Eo CJ Yes
Hyes to either or both of (i) or (ii) above - (Complete Form 1, Part Kx} This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for tre application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4, IP Reguistion, schedule 2, table 2, item 10.
TIDAL WORK; WILD RIVER AREA
4.10 ||s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No - Go1oas11 — ([] Yes - Answer (a) and (b) below
(a)_ Is any of the proposed tidal work prescribed tidal work? _
OD Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
[LI No
If no, is the work proposed in a canal?
No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
LINo- (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transpon (Maritime Safety Qid) as Concinrence Agency.
: oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
| application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensiand
Transport (Maritime Safely Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
CO Yes
{f yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qld) as
Concurrence Agency.
O Yes - (Cuinplete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qid) as
- Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. ae we
ChYes —. . 2
Ifyes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
LINo-An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it
_ OYes
! if yes, is the work proposed in a canal?
{ CJ No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No ~ Unless the application is consistent with any property development plan applying to the land, the Assessinent
! Manager must refuse (0 receive it. (Complete Forin 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and assessmem for the purposes of the Wild Rivers Act 2005.
O Yes ~ Uniess the application is consistent with any, property development plan applying to the land, the Assessment
Manager must refuse lo receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
|
I
: | OU Yes
oO No - Unless the application is consistent with any property development plan applying (o the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P} This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency. Subject to the declaration for the relevant wild river
' afea, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
! DO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
| Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
The application also requires assessment for the purposes of the Wild Rivers Act 2005. | _
. _TINo- Go to the frst question on the next page of this Checklist _
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.