Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
2008/1867
The ACH Act establishes a cultural heritage duty of care which provides that: "A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage’. \t is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
le PROP
PROPERTY NOTES —
Not applicable
ecco tnnee renee em ve neem anon semen cevertveninrensnaty
[9 PRELIMINARY APPROVAL OVERRIDING SCHEME = |
Not applicable
Pen anne ec sonny
[10 "FURTHER DEVELOPMENT PERMITS REQUIRED
pe of of Development Permit required. | Subject. of the required D Development Permit ~
| Development Permit for Building Works ‘All Building Works
| | Development Permit for Operational i Landscaping, Carparking and Access, Frontage |
| Works | Works, Stormwater Drainage, Erosion & Sediment |
| / | Control & Filling of the Site
144 “SELF ASSESSABLE CODES ~ |
Not applicable
ty ‘
tenn ncsetraremnane cevorraemietene ami
Not applicable
PPROVAL DESPITE CONFLICT WITH SCHEME |
*
RIGHTS OF APPEAL
[RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. if Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice"
may be given, Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the integrated Planning Act 1997)
a
Please note that an Infrastructure Charge i in accordance with the Coastal “Major | Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council's decision electronic copies are available
on line at www.sunshinecoast.ald.goy.au, or at Council Offices.
Page 11 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.