Skip to the record
For the highest quality transcripts.

Council archive · source document

09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

Attachments and supporting information (Complete Table 1 ~ Use a separate sow for each type of. attachment 0 or inforination, including information required under
this Part) Please ensure all: documentation submitted with this form, including other Parts of Farm 1, or wner’s consent, etc, are securely attached to this Part of the Form.

 

 

ft : i
Table | (eg. Pate ora msc ee rie (eg. cman eS Trafic Report) Date seccement eget
1 (ARTE, OVERS LV AIL
CONSERT, SOR PW ATR
DAME GT LAN

 

 

 

 

 

 

 

‘Portable Long Service Leave (PLSL) levy Applicable for centain building and construction work valued over $80,000 only ad

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (+ box if applicable)
L the application seeks a preliminary approval only;

LD the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes:
fand clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests);

Ai costs, that relate to the work both directly and indirectly, are less than $80,009, inclusive of GST; or

(J the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Paymient Form {no payment required if owner-builder permit manber stated). The receipted forn must be sighted by the
assessment manager belore a development petrnit can be given.

11. Is payment of a PLSL levy applicable to this application? (Refer to Q70 and the Advice below for more information)
RING cn of Part A (Yes - Answer 012 below

12. Has the PLSL levy been paid?

Oo No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit @ Notification
and Payment Form to QLeave.)

oO Yes - Complete Table L and submit, with the application, the ‘yellow* (Local Government's (Council) / Private Centifier's) copy of the receipted Qt eave Form.

i i QLeave Project Number
Table L Amount paid Date paid (6 digis, string with A, B, E, Lor P)

 

 

 

 

 

 

 

 

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Centifier) (Optional)

 

. Receiving Reference
Fee ($) Date received officer's name numbers

 

 

 

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

To: Council. | have been engaged as the private cerlifier for the building work referred to in this application.

 

 

 

 

Date of engagement Name BSA Certification license number Building classification’s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Amount paid Date receipted form
Description of the work QLeave Project Number 6) Date paid sighted by Name of officer who sighted the form
assessment manager

 

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992} ar
as required by Parliament. This information may be stored in a DIP database. The information collected will be retained as requited by the Public Records Act 2002.

 

 

 

Page 3

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.