Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach 1.0 Introduction 1.1 1.2 1.3 1.3.7 Background Knobel Consulting Pty Ltd has been commissioned by Neil Stebbing & Associates Pty Ltd to prepare a Stormwater Management Plan (SWMP) for a proposed residential duplex on Lot 403 RP48112, 51 Elanda Street, Sunshine Beach (the subject site). In preparing the SWMP Knobel Consulting Pty Ltd has considered stormwater quantity management during the operational phase to ensure no net increase in runoff from the site and sediment and erosion controls during the construction phase. This report has been produced to address conditions 25, 26, 37 and 39 of Council’s Material Change of Use approval for the site dated 24 March 2009. Scope This SWMP aims to: « — Establish the required performance criteria for the proposed stormwater quantity system; » Provide detailed design of stormwater infrastructure within the site; = Ensure stormwater runoff Is conveyed from/through the site to a legal point of discharge without adversely affecting both upstream and downstream flood levels; * Provide detailed design and calculations to determine if detention is required to mitigate post development flows, and » — Ensure the quality of stormwater runoff discharging from the site during the construction phase does not adversely impact on water quality and ecological values of downstream watercourses. This SWMP is in accordance with the IEAust, (National Committee on Water Engineering). Australian Runoff Quality (Draft) and the Queensland Urban Drainage Manual (QUDM). Description of Subject Site Location Figure 1 shows the subject site that is located at 51 Elanda Street, Sunshine Beach. The subject site covers an area of 755 m2. K1595-0006 5 June 2009 Page 1 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.