PROPOSED *

 

 

{
i

43

%y
ae

\
145,
\
= \.

7.20055
£222

Ry * |

ae eceee cc
7 ¥
—
4d —

 

 

 

 

 

 

 

 

 

 

 

 

$8, Po,
” nanos ROAD, A BUND 19?

 

ENTRY/EXIT PAD FALL:

TO BE INSTALLED ACROSS
THE AGGREGATE PAD TO

DIRECT RUNOFF TO
SEDIMENT FENCE

40-75mm CRUSHED ROCK
OR RECYCLED CONCRETE

     

       

LEGEND i

—/——- + ———__ SEDIMENT FENCE

——_sFw -—; SEDIMENT FENCE WEIR

> —> ——> — >, TEMPORARY DIVERSION DRAIN

SEDIMENT AND EROSION CONTROL NOTES

1

 

STABILISED ENTRY/EXIT POINT - TYPE A

 

NTS OR APPROVED EQUIVALENT

DENOTES STABILISED ENTRY/EXIT
POINT, REFER LAYOUT PLAN FOR
LOCATIONS.

 

 

 

SEP

 

 

[~>———et
>

  

 

 

 

 

 

 

 

 

 

 

 

 

 

. PONDED RAINFALL SHALL BE PUMPED THROUGH A SEDIMENT FENCE LOCATED ON THE SITE

i
STABILISED ENTRYEXIT POINT

 

Yr
ZF | CONFINED WASTE DISPOSAL AREA
LL

S14
+

WATER QUALITY MONITORING STATION

THE PROJECT SEDIMENT AND EROSION CONTROL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE SITE'S APPROVED STORMWATER MANAGEMENT PLAN.

CONSTRUCTION IS TO BE PROGRAMMED TO PROVIDE INSTALLATION OF PERIMETER
LANDSCAPING / SURFACE TREATMENTS AS EARLY AS PRACTICAL.

THE CONTRACTOR'S WORKS PROGRAM IS TO BE REVIEWED AT THE PRESTART MEETING.
ALTERATIONS TO THE PROGRAM MAY BE REQUIRED TO ENSURE SATISFACTORY EROSION AND
SEDIMENT CONTROL.

SAFETY ISSUES MUST BE CONSIDERED AND MONITORED FOR EACH DEVICE TO THE
SATISFACTION OF THE SUPERINTENDENT.

SEDIMENT FENCE FILTER FABRIC IS TO BE APPROVED BY THE ENGINEER.

SEDIMENTATION MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES AND MAINTAINED AT A SUITABLE LEVEL/ CONDITION THROUGHOUT
CONSTRUCTION.

SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED BY 30%.

DRAINAGE STRUCTURE PROTECTION IS TO BE CLEANED FOLLOWING EACH SIGNIFICANT RUNOFF
PRODUCING STORM.

ACCESS TO THE SITE IS TO BE PROVIDED BY THE CONTRACTOR. APPROVAL IS TO BE OBTAINED
FROM SUNSHINE COAST REGIONAL COUNCIL FOR THE LOCATION OF THE SITE ACCESS POINT
AND WASH DOWN AREA WHICH IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION
PERIOD. ACCESS TO AND FROM THE SITE IS TO BE VIA THE SHAKEDOWN FACILITY ONLY. ALL
VEHICLES ARE TO BE WASHED DOWN PRIOR TO LEAVING THE SITE. wage

THE CONTRACTOR SHALL PROVIDE TEMPORARY DRAINAGE CONTROLS TO DIVERT FLOW FROM
UNDISTURBED AREAS AROUND DISTURBED AREAS AND DIRECT FLOW FROM DISTURBED AREAS
TOWARD CONTROL DEVICES.

BEFORE DISCHARGING INTO THE DOWNSTREAM STORMWATER SYSTEM.

STRAW BALES USED IN SEDIMENT DEVICES ARE TO BE REPLACED AFTER A MAXIMUM SERVICE
PERIOD OF 6 WEEKS.

 

 

 

   

 

 

 

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRE FILTER CLOTH WIRE CLOTH CLIPPED. FILTER CLOTH . PROVIDE TOPSOIL LAYER FILTER CLOTH :
TO EACH STAKE AT 600 CRS \ ie OVER FILTER CLOTH FOR t LAP 100mm WEIR TO BE 600mm —}-—————~|_] REFER LAYOUT PLAN FOR SURFACE
aeseap =a a ee — Aaa = > FULL LENGTH OF SILT FENCE WIDE UN.O. ON TREATMENT AT WEIR OUTLET
; * + LAYOUT PLAN
ag +
3 ig
ROAR . “

PROVIDE WIRE STRAND 50 x 50 HW STAKES pS 5G

BETWEEN STAKES FOR OR STAR PICKETS CONSTRUCT WEIR WEIR HEIGHT TO BE

FILTER CLOTH SUPPORT b SECTION SiMBAR TO SEDIMENT Y 450mm U.N.O. ON LAYOUT

FENCE PLAN
ELEVATION
; ELEVATION
SEDIMENT FENCE DETAILS “ENCE REFER LAYOUT SEDIMENT FENCE WEIR
wes DENOTES SEDIMENT , REFER NTS” —7——Tsew — DENOTES SEDIMENT FENCE WEIR, REFER LAYOUT
PLAN FOR LOCATION AND EXTENTS. \ PLAN FOR LOCATION AND EXTENTS.
LENT : DESIGN DRAWN, APPROVED — | TITLE t PROJECT NO.
Sar pepegege “NOBEL CONSULTING PTY LTO | steve RaCKEMANN 1P EL SEDIMENT AND EROSION CONTROL
ENGINEERS - PROJECT MANAGERS = feaoccr CWHAGER- RPEO MABER 658 LAYOUT PLAN & DETAILS SHEET K1595
PROPOSED DUPLEX DWGNO. | ISSUE
Phona: 07 5576 4168 ef09 Burleigh -
A z.0603 | ISSUED FOR APPROVAL Fac or S876 ear? Bursigh Heads OFD 4200 51 ELANDA STREET. SCALE 4125ATAL 0 5 10 seo01|] A
eae) ane ENT Emak [email protected] ABN 33071435202 | SUNSHINE BEACH, QLD = ip fe DA
7

 

 

 

 

 

 

 

 

ZAKI S@S\Constructoni WCW 506-SENO 1A the, 20/2008 9:07:25 AM, evan, adobe pol

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.