Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
ROADWORKS NOTES 1, GEOTECHNICAL TESTING FOR PAVEMENT CONSTRUCTION IS TO BE CARRIED OUT IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL STANDARDS, TEST CERTIFICATES ARE TO BE PREPARED BY A REGISTERED N.A.T.A. LABORATORY AT THE CONTRACTOR'S COST AND SHALL BE PROVIDED TO THE ENGINEER PROGRESSIVELY THROUGH THE WORKS, THE CONTRACTOR IS TO NOTIFY THE ENGINEER OF ANY NON-CONFORMANCES, ALL NON CONFORMING WORK IS TO BE RECTIFIED AS DIRECTED BY THE ENGINEER. 2. FULL DEPTH PAVEMENT CONSTRUCTION SHALL EXTEND BEHIND ALL KERB AND KERB AND CHANNEL FOR A DISTANCE WHICH IS THE GREATER OF 150mm FROM THE BACK OF KERB OR ACROSS TO THE OUTER LIMIT OF SIDE DRAIN FILTER MATERIAL, 3. KERB/KERB AND CHANNEL TRANSITIONS ARE TO BE MADE SMOOTHLY OVER MIN. 1.0m LENGTH, 4, PAVEMENT THICKNESSES NOMINATED ON THESE DRAWINGS ARE PROVISIONAL. INSITU PAVEMENT SUBGRADE (AT THE UNDERSIDE OF THE NOMINATED LOWER SUBBASE COURSE WITHIN FILL AREAS, AND TO THE UNDERSIDE OF THE NOMINATED UPPER SUBBASE COURSE WITHIN CUT AREAS) TESTING IS TO BE CARRIED OUT BY A REGISTERED NATA, 0.190 fT 200 SERIES H-BLOCK COREFILLED MASONRY a N16-400 HORIZONTAL, N16-400 VERTICAL _ 5.693 GL. 45.20]] | 4 LABORATORY AT THE CONTRACTORS COST AND SHALL BE PROVIDED TO Pa THE ENGINEER FOR FINALISATION OF PAVEMENT DESIGN (CONTRACTOR IS oT TO ALLOW 3 WORKING DAYS FOR ENGINEER'S RESPONSE). ig Tae 5, SUBSOIL DRAINAGE TO BE PROVIDED BENEATH ALL BARRIER AND MEDIAN —_ N See, 3.600m WIDTH FOR ZONE OF INFLUENCE. KERB. “OL PROPOSED EASEMENT 6. FOR DIGITAL SETOUT REFER TO CONSULTING ENGINEER FOR DATA. — orm ~ 200 AT PIER 4-N16 TOP & BTM N12-450(2L) SHEAR Tp LOCATIONS 1.400, | TIES WITH N12-226(2L) 100mm EITHER Yn sm 7 SIDE OF PIER pe ——— ‘ “ye ~ PILING, SCREW PIERS OR OTHER is Pp , DESIGNED, INSTALLED & CERTIFIED BY y PILING CONTRACTOR Lo Z 00 STEBBING 8 ASSOOIATES PTY LTD ZONE OF NRLUENCE STRUCTURAL ENGINEERS & EXISTING SEWER ZONE OF INFLUENCE ” CUENT DESIGN: DRAWN APPROVED THLE PROJECT NO. Kecve consti ryit, KNOBEL CONSULTING PTY LTD | cteve RACKEMANN 1 uF |e ROADWORKS NOTES & SEWER ZONE OF K1595 ENGINEERS - PROJECT MANAGERS —[ppowect CWAAGER- RPO. NABER C535 *— INFLUENCE SED Ol DWG NO. ISSUE B | c20609 | TITLE BLOCK AMENDED Phone: 07 8576 4168 6/109 West Burteigh Road ORO ANDA omen nz e a 27-0505 | ISSUED FOR APPROVAL — Fee O07 S5766477 Burleigh Heads QLD 4220 INE BEACH ' ow. oat a 0 500 1000 1500 z000mm R002 B wel oe mana = Emak [email protected] ABN 33071 435202 | SUNS! , QLD pigetie Cee ES RP BOUNDARY 29K 1805 Construction WKY 1525-RO02-B stu, 26/2009 06 AL AM, evant, Vinobalanw'iK_C3E2_CAD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.