09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

ROADWORKS NOTES

1, GEOTECHNICAL TESTING FOR PAVEMENT CONSTRUCTION IS TO BE CARRIED
OUT IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL
STANDARDS, TEST CERTIFICATES ARE TO BE PREPARED BY A REGISTERED
N.A.T.A. LABORATORY AT THE CONTRACTOR'S COST AND SHALL BE
PROVIDED TO THE ENGINEER PROGRESSIVELY THROUGH THE WORKS, THE
CONTRACTOR IS TO NOTIFY THE ENGINEER OF ANY NON-CONFORMANCES,
ALL NON CONFORMING WORK IS TO BE RECTIFIED AS DIRECTED BY THE
ENGINEER.

2. FULL DEPTH PAVEMENT CONSTRUCTION SHALL EXTEND BEHIND ALL KERB
AND KERB AND CHANNEL FOR A DISTANCE WHICH IS THE GREATER OF
150mm FROM THE BACK OF KERB OR ACROSS TO THE OUTER LIMIT OF SIDE
DRAIN FILTER MATERIAL,

3. KERB/KERB AND CHANNEL TRANSITIONS ARE TO BE MADE SMOOTHLY OVER
MIN. 1.0m LENGTH,

4, PAVEMENT THICKNESSES NOMINATED ON THESE DRAWINGS ARE
PROVISIONAL. INSITU PAVEMENT SUBGRADE (AT THE UNDERSIDE OF THE
NOMINATED LOWER SUBBASE COURSE WITHIN FILL AREAS, AND TO THE
UNDERSIDE OF THE NOMINATED UPPER SUBBASE COURSE WITHIN CUT
AREAS) TESTING IS TO BE CARRIED OUT BY A REGISTERED NATA,

0.190
fT 200 SERIES H-BLOCK COREFILLED MASONRY
a N16-400 HORIZONTAL, N16-400 VERTICAL

 

_ 5.693

 

GL. 45.20]] |

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

LABORATORY AT THE CONTRACTORS COST AND SHALL BE PROVIDED TO Pa
THE ENGINEER FOR FINALISATION OF PAVEMENT DESIGN (CONTRACTOR IS oT
TO ALLOW 3 WORKING DAYS FOR ENGINEER'S RESPONSE). ig Tae
5,  SUBSOIL DRAINAGE TO BE PROVIDED BENEATH ALL BARRIER AND MEDIAN —_ N See, 3.600m WIDTH FOR ZONE OF INFLUENCE.
KERB. “OL PROPOSED EASEMENT
6. FOR DIGITAL SETOUT REFER TO CONSULTING ENGINEER FOR DATA. — orm
~ 200 AT PIER 4-N16 TOP & BTM N12-450(2L) SHEAR Tp
LOCATIONS 1.400, | TIES WITH N12-226(2L) 100mm EITHER Yn sm
7 SIDE OF PIER pe
——— ‘ “ye ~
PILING, SCREW PIERS OR OTHER is Pp
, DESIGNED, INSTALLED & CERTIFIED BY y
PILING CONTRACTOR Lo Z
00 STEBBING 8 ASSOOIATES PTY LTD ZONE OF NRLUENCE
STRUCTURAL ENGINEERS
&
EXISTING SEWER ZONE OF INFLUENCE
” CUENT DESIGN: DRAWN APPROVED THLE PROJECT NO.
Kecve consti ryit,  KNOBEL CONSULTING PTY LTD | cteve RACKEMANN 1 uF |e ROADWORKS NOTES & SEWER ZONE OF K1595
ENGINEERS - PROJECT MANAGERS —[ppowect CWAAGER- RPO. NABER C535 *— INFLUENCE
SED Ol DWG NO. ISSUE
B | c20609 | TITLE BLOCK AMENDED Phone: 07 8576 4168 6/109 West Burteigh Road ORO ANDA omen nz e
a 27-0505 | ISSUED FOR APPROVAL — Fee O07 S5766477 Burleigh Heads QLD 4220 INE BEACH ' ow. oat a 0 500 1000 1500 z000mm R002 B
wel oe mana = Emak [email protected] ABN 33071 435202 | SUNS! , QLD pigetie Cee ES

 

RP BOUNDARY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29K 1805 Construction WKY 1525-RO02-B stu, 26/2009 06 AL AM, evant, Vinobalanw'iK_C3E2_CAD

 

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.