09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Part E
Building &/or operational work assessable against a planning scheme!
: on, - » .
_ Nature of the works lye a . - wae .
1. Nature of work that requires assessment againsLa planning scheme:
(1 Building work - Complete Table A Operational work - Complete Table B
Table A
(i) What is the nature of the building work made assessable in the planning scheme?
(ii) Are there any current approvals associated with this application? (e.g. materia change of use}
CINo (1 Yes - Provide devaits below
List of approval reference/s Date approved Date approval lapses (if known)
[ 4.
Table B
(i) Whatis the nature of the operational work made assessable in the planning scheme?
Ur Rosdworks [stormwater (Water infrastructure [_] Clearing vegetation under the planning scheme
(1 Drainage works ~~] Earthworks CL Sewerage infrastructure
C1 Landscaping D1 Signage (Cther - Specly S€QnE YF SOW C ra
(iii) What type of approval is being sought? (O76: / you have indicated muttipie operational works in question @) above and your answers to this question
would be different for different operational work, it may be more appropiate to provide these details in an attachment to this form)
[EX bevelopment Permit (1 Preliminary Approval C1 Both ¢specity below)
(iv) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision/?
we D1 Yes - Specify the number of lots being created
(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a toy
CINo Yes - Complete Table Bfa)
Table B(a} List of approval references . Date approved Date approval lapses (if known)
1. | SUARIAE CAT REG. COATT
2008F/IFEF 2y/ 3/09
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) $ 10,000
fe 2
Mandatory information ‘
* -
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement] Method of lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works ficuuting he
lextent of any cut and fi) 1 Confirmed
OFFICE USE ONLY
Date received Reference numbers.
Advice for completing Part E
General advice
. Part A must also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly ta another question.
a1 I A development peril authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development lo occur.
1 This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever
planning scheme is mentioned, take it to mean the land use plan for the airport land.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.