09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.2

   
     

Part E

Building &/or operational work assessable against a planning scheme!

: on, - » .

  

 

_ Nature of the works lye a . - wae .
1. Nature of work that requires assessment againsLa planning scheme:

(1 Building work - Complete Table A Operational work - Complete Table B

Table A

(i) What is the nature of the building work made assessable in the planning scheme?

(ii) Are there any current approvals associated with this application? (e.g. materia change of use}

 

 

 

 

 

 

 

 

 

 

CINo (1 Yes - Provide devaits below
List of approval reference/s Date approved Date approval lapses (if known)
[ 4.
Table B
(i) Whatis the nature of the operational work made assessable in the planning scheme?
Ur Rosdworks [stormwater (Water infrastructure [_] Clearing vegetation under the planning scheme
(1 Drainage works ~~] Earthworks CL Sewerage infrastructure
C1 Landscaping D1 Signage (Cther - Specly S€QnE YF SOW C ra

(iii) What type of approval is being sought? (O76: / you have indicated muttipie operational works in question @) above and your answers to this question
would be different for different operational work, it may be more appropiate to provide these details in an attachment to this form)

[EX bevelopment Permit (1 Preliminary Approval C1 Both ¢specity below)

(iv) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision/?
we D1 Yes - Specify the number of lots being created

 

 

 

 

 

(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a toy
CINo Yes - Complete Table Bfa)

Table B(a} List of approval references . Date approved Date approval lapses (if known)

1. | SUARIAE CAT REG. COATT

2008F/IFEF 2y/ 3/09

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) $ 10,000
fe 2

 

 

 

 

 

 

 

 

 

 

 

 

 

Mandatory information ‘

* -

3. Confirm the following mandatory information accompanies this application

 

Confirmation of lodgement] Method of lodgement

Plans, and specifications if applicable, showing the nature and location of the proposed works ficuuting he
lextent of any cut and fi) 1 Confirmed

 

 

 

 

 

OFFICE USE ONLY
Date received Reference numbers.

 

 

 

 

 

 

 

Advice for completing Part E

General advice
. Part A must also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly ta another question.

a1 I A development peril authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development lo occur.

1 This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever
planning scheme is mentioned, take it to mean the land use plan for the airport land.

Page 1

 

 

 

 

 

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.