Officer: 	Lisa Pienaar
Direct Telephone: 	07 53296514
Our Reference:	MCU22/0051
Your Reference:	102995-10
23 June 2022
Bunnings Group Limited
C/- RPS Australia East Pty Ltd
PO Box 1559
FORTITUDE VALLEY  QLD  4006
[email protected]
Dear Sir/Madam
Information Request
Planning Act 2016
I refer to your application and advise that Council requires further information to satisfactorily assess the proposal.
application details
Application No.	MCU22/0051
Street Address:	178 Eumundi Noosa Rd Noosaville Qld 4566
Real Property Description:	Lot 101 SP 279285
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
INFORMATION REQUIRED
The information requested is set out below:
Issue – Plans
The plans are not clear and it is difficult to determine what the layout consists of on both levels.
The plans are not clear as to how circulation or access areas function.

Information Required
Provide amended plans that clearly show the floor layout for each level and access and circulation areas.  Provide a legend on the plans where necessary.
Include RL levels from existing and finished ground level to the highest point of the building.

Issue – Expansion of existing Bunnings
The proposal is considered an expansion of the existing Bunnings.  There is no evidence that the proposed Trade and Hardware supplies will operate independently to the existing Trade and Hardware supplies, or that the existing Trade and Hard supplies will be maintained. The new Trade and Hardware supply building will be available to all customers and is not restricted to trades people only.  It is also noted that the plans refer to ‘extent of expansion’.
Information Required
Identify the intent of floor areas for the existing Bunnings building.

Issue – Design and building height
Acceptable outcome AO8.1 of the Medium Impact Industry zone code seeks a maximum height of 10 metres.  The proposed building is at a height of approximately 12 metres.  Although the building is 2 storeys and complies with Performance outcome PO8 (b), it does not comply with PO8 (a), (c) or (f) of the Code.
Specifically with regard to design, the proposed building does not comply with AO11, particularly the elevation to Gateway Drive.
Further, the roof form (3 degree pitch is not visible) and building does not comply with AO7.5 of the Noosaville Local Plan Code.
Information Required
Provide amended plans that comply with Acceptable outcome AO8.1 or alternatively PO8 (a), (c) and (f) and AO11 of the Medium Impact Industry zone code, and AO7.5 of the Noosaville Local Plan Code.

Issue - Landscaping
The proposed development on the portion of the lot (future Lot 103) does not comply with the minimum landscaping requirements which require 15% of the site to be landscaped with 60% forward of the building.  The proposal includes significantly less than the 611m2 required.
Information Required
Provide an amended plan that provides for 15% landscaping on proposed Lot 103 and complies with PO10 and AO25 of the Business Activities Code.

Issue – canopy – existing building
The proposal plans show a Bagged Goods Canopy adjacent to the outdoor nursery which has a floor area of 880.71m2.  It is noted that the existing approval for the building does not have the extent of roofline.
Information Required
Provide information with regard to any changes to the bagged goods area that has occurred since the approval.

Issue
The current property boundary to Gateway Drive (north-western section) stands in close proximity to the kerb and channel and a road dedication is required. This issue has been raised with the applicant previously (PLM21/0061) but the submitted drawings do not clearly indicate the necessary widening.
Information Required
Clearly indicate the required road dedication on the amended plans

Issue
The submitted plans do not clearly indicate the various vehicle paths into the building and around the building.
Information Required
Provide plans that clearly indicate the various vehicle paths into the building and around the building. The plans must include the swept paths for the various vehicle types at the critical locations

Issue
The proposed development will include significant earthworks but the submitted material does not include any comment, plans or reports regarding the extent of earthworks and the proposed retaining structures.
Information Required
Provide detail and plans that clearly indicate the extent of earthworks and the proposed retaining structures. The detail must also include a site specific soils investigation that includes recommendations for the construction of the development works.

Issue – Traffic and access
There will be a demand for customers to use both centres in the same trip and for this reason there should be integration between the two buildings for cars, pedestrians and service vehicles.
Information Required
Provide amended plans that address and provide for the following:
Redesign the proposal to integrate the vehicular access arrangements (car and service vehicle) and pedestrian connectivity of the proposed Bunnings expansion with the existing Bunnings development.
Demonstrate how vehicles would safely and appropriately exit the existing northern Bunnings access driveway and then enter the proposed new Bunnings expansion driveway.
Quantify and justify the loss of on-street parking arising from the proposed access arrangements.
Demonstrate that a delivery vehicle entering the new driveway will have adequate height clearance where it passes under the new building.
Justify one-way operation of the proposed basement carpark when the preferred two-way operation can be readily accommodated.

Issue - Traffic generation
It is noted that traffic generation rates in the traffic report use 50% of the traffic generation rates associated with the existing Bunnings.
Information Required
Provide a revised traffic assessment based on traffic generation rates and distribution derived from the traffic generation of the existing bunnings development (from the existing counts at the Bunnings access driveways included in the TTM report),and include assessment of impacts at the Gateway Drive / Rene St / Eumundi Noosa Road roundabout.

Issue: Stormwater Quality
The bioretention device proposed to manage stormwater quality at the site has an area of approximately 0.8% of the site area, which is less than typically expected for this development type.
Information required:
Provide an updated SWMP and MUSIC model which addresses the following:
The stated modelled site catchment in the SWMP is 0.378ha, where-as the site area is 0.415ha. Explain and resolve this discrepancy
Caloundra WWTP has been used as the rainfall station for the MUSIC model, however Cooroy Composite is closer to the site and considered more representative. Either justify the use of Caloundra rainfall data based on a comparison of rainfall records between the two locations or amend the analysis based on the Cooroy Composite data
Clarify the areas used for representing the extended detention storage in the model, consistent with the MUSIC Modelling Guidelines Section 4.5.2
Include roofwater harvesting and reuse, consistent with the requirements of the Sustainable Building Design Code. This may include capture of roofwater for irrigation of site landscaping.
Please note that stormwater infrastructure is not permitted within the front landscaped setback.

Issue: Stormwater Drainage
Information required:
Provide a preliminary design section for the detention/bioretention basin showing:
Surveyed level of existing drainage network which the site proposes to connect to;
Design level of adjacent pavement levels within the site and outlet level of internal site drainage network into the basin; and
Detention storage depth, extended detention depth for bioretention, filter media depth and demonstrate that sufficient fall is available to accommodate all these depths and that the bioretention sub-soil drains will be free draining.
Update the design of the detention basin proposed for the site to include allowance for increased rainfall intensity due to climate change (i.e. analysis of the 1%AEP event at end of planning period 2100).

due date for response to information request
The due date for providing the requested information is 26 September 2022. Email your response to [email protected]. Please advise Council of your response to this information request in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided not to respond to the information request and Council will continue with the assessment of your application.
other details
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact me on the number above.
Yours faithfully,

Lisa Pienaar
Development Planner

[word/footer1.xml]
Page 2 of 2

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 2

[word/header1.xml]
3

Used in these records

About this file

File size
80 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Information Request MCU22 0051.docx · 80 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.