Council archive · source document
07/1541 - MCU - Detached House [As Published] · 132007.1541
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the [P Regulation.
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable boxles)—
(1 (\) a material change of use assessable against the planning scheme for a purpose
Mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered "none of the above’, the schedule.
application triggers referral toQT asa ~
concurrence agency. OO (il) reconfiguring a fot—
[1 (@)_ onland that is completely or partly within a public transport corridor, and the
total number of lots increases;
[1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
C1 (6) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
[1 (@) fora residential purpose within the 25 ANEF contour for an airport;
De) fora residential purpose resulting in 100 or more allotments.
OO (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
[0 (b) will result in work that encroaches into an airport's operational airspace. e
Zl (iv} none of the above.
Railay safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule
8A of the {PA & schedule 2 of the IP Reaulation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
LC (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
concurrence agency. oO (ii) reconfiguring a lot—
. (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[1 (b) on tand that is within 400m of a Citytrain passenger railway station or a future
Sete _ a Citytrain’ passenger railway station, and the total site area is 5000m? or
greater;
(1 (©) ontand that abuts rail corridor land, commercial corridor land or future railway
- land, and the total number of lots increases;
C1(d)_ ontand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
C1 (e) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 (f) for a residential purpose resulting in 100 or more allotments. @
LO (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m’, on land that—
(12) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
(1 (©) abuts rail corridor land, commercial corridor land or future railway land, and
. the work is within 25m of the railway boundary.
mm (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP.
Beaulation.
Untess you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice,
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any stucture or work will be located wholly or partly in the
easement.
C2 (ii) reconfiguring a fot
(1 (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
0) none of the above.
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1541 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.