Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

07/1541 - MCU - Detached House [As Published] · 132007.1541

of 55

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assassable, or are exempt
from wild river requirements.

H you ticked Q13 i), your apptication must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

Hf you ticked Q13 fi) an application is nat required
to be made however the works must comply with
the retevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessabie development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply‘with the code.

Ifyou ticked Q13 iii) your application Is not
subject to wild river requirements.

Applications for development that is other than
« that stated to be assessable, self-assessable or
exempt will not be accepted.

Works that interfere with overland flow
water

The relevant wild river dectaration will state
* works that interfere with overtand flow water that
are either self assessable, assessable or exempt
from wild river requirements.

If you ticked Q15 j), your application must be
assessed by NRW against lhe Wild Rivers Code
_ and must comply with the code.

If you ticked Q15 li) an application is not required
to be made however the works must comply with
the retevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development far which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Mf you ticked Q15 iii) your application is not
subject to wild river requirements.
Applications for development that is other than

that stated to be assessable, self-assessable or
exempt will not be accepted.

Waterway barter works

Applications for building or raising waterway
barrler works in a HPA will not be accepted.

Ifyou answered YES to Q16, your application
must be assessed by OPIF against the Wild
Rivers Code and must comply with the code.

13.

14.

15.

16.

IDAS. Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

oO NO oO YES (ensure you have completed Part K, of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
oO i) assessable works

(7 ii) self-assessable works

(iii) exempt works

Does the application involve works that interfere with overland flow water in a FMA?
oO NO oO YES (ensure you have completed Part Ky) of Form 1}

If YES, is the application for works stated in the relevant wild rivers declaration to be?
O i) assessable works

(ii) self-assessable works

Dili) exempt works

Does the application involve building or raising waterway barrier works in a PA?
Oo NO O YES (ensure you have completed Part O; of Form 1)

 

Aquaculture (non ERA} 17. Does the application involve aquaculture in a PA?
eee for aquacutture in a HPA wil nat be Ono (CI YES (ensure you have completed Part O, of Form 1)

If you answered YES to Q17, your apptication
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for afl works that interfere with water
Ina watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

{na PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your application will
hot be accepted.

Note: Operational works outside a HPA or -
nominated waterway are not subject to wid
requirements. 7
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website .
www now.ald,gov.au of contacting the
department by email on:

 

18.

Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

oO NO oO YES (ensure you have completed the relevant Part K of Form 1)

If YES,
oO i) The application is for an instream dam or weir, or

oO ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

 

Page 13

Used in these records

About this file

File size
7.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1541 - MCU - Detached House [As Published].pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.