Council archive · source document
07/1541 - MCU - Detached House [As Published] · 132007.1541
INTEGRATED PLANNING ACT 1997
State-controtied road matters
For more information refer to Guide 3.
Unless you answered ‘none of the above” to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.
(n certain circumstances OMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.
Schedule 2 of the {P Regulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick applicable box/es)
(1) development on land contiguous to a State controlled road and for -
(1 (a) material change of use assessable against the planning scheme;
1 (b) reconfiguring alot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
C1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b} above)-
associated with access to a State-controlled road; or
« for filling or excavation; or . ‘*;
. © involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LD (ii) development on land nof contiguous to a State-controlled road and -
O(a) material change of use -
« assessable against the local government's planning scheme; and_
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
C (b) reconfiguring a lotfor a purpose mentioned in schedule 5 of the IP regulation
exceeding the thresholds set by that schedule; é
1 (¢) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule,
Dd (iii) none of the above
Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above" to Q3,_
~ the application requires assessment by the ~~
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.
If you ticked Q3(i) or (ii), your application requires
referral to NRW for assessment regardless of
whether vagelation clearing is proposed or not.
The application involves: (tick applicable box/es)
(C1 () material change of use -
- (a)- assessable against the planning scheme; nn oa
(b) on a lot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation or
* if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c)_ where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is hectares or larger - complete Part J of Form
reconfiguring a lot-
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if théfe is no property map of assessable vegetation ®@
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
DO (ili)’ operational work -
: (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form t
Pef'(iv) none of the above.
Oi
Strategic port land
For more information refer to Guide 41,
Ifyou ticked (j} - the relevant Port Authority is the
assessment manager for the application.
Ifyou ticked (ii) Queensiand Transport is a
concurrence agency for the application.
The application involves:
[1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1 /
OO (ii) a material change of use that is inconsistent with the land use plan approved under the TI
Act for the strategic port land - complete Part | of Form 1
Bd'(il) none of the above «
4 Land contiguous to a State-controtled road is defined in schedule 14 of the [P Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1541 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.