Council archive · source document
07/1541 - MCU - Detached House [As Published] · 132007.1541
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 Aprit 2007
Operational work that is tidal workor = 19. The application involves operational work that is: ( tick the applicable box/es)
work in Coastal m me metet a C1). tidal work” as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form f, OF
local goverment tidal areas refer to Guide 24 (CO i) tidal work that is prescribed tidal work” other than in a canal"? -complete Part P of Form 1;0F
Unless you answered “none of the above” to Q9,
the application requires assessment by the C fii) carried out within a coasts! management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to {i} below are ticked.
Wan agency qe tan pane assessment [1 @) constructing or installing works in a watercourse between MHWS and HAT (ie.
manager for the application, isa - ae .
concurrence agency forthe application in other than these works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000;
Local govemmentis the assessment manager [1(b) constructing a canal” intended to be connected to tidal waters;
for all preseribed tidal work.
ora presen “ CA (©) constructing an artificial waterway;
[1 @)_ reclaiming land under tidal water;
[1 €) disposing of dredge spoil or other solid waste material in tidal water;
(71 (f) _ interfering with quarry material on State coastal land above high-water mark;
(21 (9) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
L1(h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(i) constructing a bank or bund wall to establish a ponded pasture on land, oth
: than State coastal land, above high-water mark; or
x (iv) none of the above.
Operational work below high water mark | 10. The application involves operational work that is: ( tick the applicable box/es)
For more information refer to Guide 18, For
more information about prescribed tidal work in LO (i) fidal work® as defined under the Coastal Protection and Management Act 1995 (the
local government tidal areas refer to Guide 24. Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; OF
Unless you answered “none of the above" to LD (ii) tidal work that is prescribed tidal work - complete Part P of Form 1;0t
Q10, the application triggers referral to es . cae -o.
it C1 (ii) carried out within a coastal management district’ under the Coastal Act and for -
38 8 coneumenes gency. (fa) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager . eee oe eee pocmonser . cee an
for all prescribed tidat work. M of Form 1,
(1 (b) reclaiming land under tidal water - complete Part M of For f, or
(1 ©) constructing a canal”, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1,
R (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For mare Information refer to Guide 18, [1 (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to work canied out completely or partly in a coastal management cistrict’® @
Q11, the application requires assessment by the . . | . . ne
Environmental Protection Agency (EPA). Oi) a material change of use assessable under a planning scheme involMing building work,
If an agency other than EPA is the assessment carried out completely or partly in a coastal management district that is —
: Cass eaeren tr te eppeaon in « the construction of a new premises with a GFA'6 of at least 1000m2
felation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2
0 fii) reconfiguring a lotassessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Civ) reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with the
construction of a canal’? ~ complete Part M of Form 1
Rl {v) _ none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tida! work is defined in the Coastal Protection and Management Regulation 2003 and indudes certain tidal works completely of partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995 -
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1996, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of haw to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under 8117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
"accompanied by the application for the operational works to construct the artificiat waterway.
Page 4 .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1541 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.