Log in to see the plans as drawn 5. CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site
is to be managed to comply with the relevant requirements and minimise any adverse
impacts to the downstream catchments.
• The existing site and upstream catchments’ drainage patterns currently discharge
from the site as overland flows into towards Lake Doonella to the south of the site.
• The proposed legal point of discharge for the site will continue to be Lake Doonella.
• The existing and proposed development site have been modelled for the critical
design storm events for the site, which found attenuation would be required. Further
modelling for the mitigated developed site was able to demonstrate that there will
be no increase to total existing discharge conditions from the site for any of the storm
events.
• During construction, erosion and sediment control measures shall be implemented
to minimise potential contaminants impacting the downstream receiving
environment. An erosion and sediment control plan shall be developed as part of a
submission for Operational Works approvals.
• In the operational phase of the development, a stormwater treatment train will
provide quality will be implemented in a manner consistent with the nature of the
proposed development. Roof run-off is to be directed towards 4 x 3,000L rainwater
reuse and attenuation tanks that will be fitted with first-flush divertors to will divert
initial roof run-off to on site irrigation of vegetated areas. The tanks are to be
plumbed for reuse for internal (laundry and toilets) purposes that will serve to
provide both treatment and reduce the volume of run-off leaving the site. Ocean
Protect Ocean Guard litter baskets will be provided to the pits within the driveway
areas to provide at source primary treatment. The piped drainage will be discharged
through a turfed buffer zone to provide treatment and flow rate reductions.
• By implementing the proposed stormwater solution, it is considered that stormwater
layout proposed will minimise any adverse impacts to the downstream environment
arising from the stormwater run-off while also achieving the performance outcomes
required for the development.
Page 12 of 14
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.