Attachment 1 - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EXISTING SITE CATCHMENT AREAS PROPOSED SITE CATCHMENT AREAS
MCU
ISSUE
EXTERNAL UPSTREAM
E2 E2 CATCHMENT
E1 E1
INTERNAL GROUND
CATCHMENT
C1 C2
INTERNAL ROOF
CATCHMENT
R1
R2
R1 R2
R3 R4
C2
08/11/21 REVISE FOR RFI - BRP
23/08/21 ISSUED FOR MCU - BRP
C1 DATE REVISION MARK CHK
PROJECT ENGINEER
C3 C4
E [email protected]
PROPOSED CATCHMENT AREAS A 37 MARY ST NOOSAVILLE, QLD
FRACTION P +61 7 5211 1003
CATCHMENT AREA (Ha)
IMPERVIOUS (%)
CLIENT
EXISTING CATCHMENT AREAS R1 0.013 100.0
ROWAN ANDERSON
FRACTION R2 0.013 100.0
CATCHMENT AREA (Ha) PROJECT
IMPERVIOUS (%)
R3 0.013 100.0 53 - 55 DOONELLA STREET
R1 0.017 100.0
R4 0.013 100.0 TEWANTIN
R2 0.024 100.0
C1 0.011 75.9
C1 0.048 7.1 TITLE
C2 0.016 70.1
C2 0.041 23.0 STORMWATER CATCHMENT
C3 0.026 22.9
E1 0.003 69.4 PLAN
C4 0.025 30.2
E2 0.006 50.6
E1 0.003 69.4
PROJECT NO. DRAWING NO. STATUS
E2 0.006 50.6 20210038 C20 MCU
DRAWN DESIGNED SCALE ISSUE
BRP BRP NTS B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.