Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attachment 1 - Stormwater Management Plan

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          EXISTING SITE CATCHMENT AREAS                                                                         PROPOSED SITE CATCHMENT AREAS
                                                                                                                                                                                                             MCU
                                                                                                                                                                                                                 ISSUE



                                                                                                                                                                                                              EXTERNAL UPSTREAM
                                                E2                                                                                              E2                                                            CATCHMENT
E1                                                                                               E1

                                                                                                                                                                                                                 INTERNAL GROUND
                                                                                                                                                                                                                 CATCHMENT
                                                                                                      C1                                          C2
                                                                                                                                                                                                                 INTERNAL ROOF
                                                                                                                                                                                                                 CATCHMENT




     R1
                                                     R2

                                                                                            R1             R2


                                                                                                                                    R3                       R4




                                                  C2



                                                                                                                                                                                         08/11/21   REVISE FOR RFI                 -    BRP
                                                                                                                                                                                         23/08/21   ISSUED FOR MCU                 -    BRP
C1                                                                                                                                                                                        DATE              REVISION              MARK CHK
                                                                                                                                                                                         PROJECT ENGINEER

                                                                                                      C3                                          C4



                                                                                                                                                                                          E [email protected]
                                                                                                                                                PROPOSED CATCHMENT AREAS                  A 37 MARY ST NOOSAVILLE, QLD
                                                                                                                                                                         FRACTION         P +61 7 5211 1003
                                                                                                                                      CATCHMENT        AREA (Ha)
                                                                                                                                                                      IMPERVIOUS (%)
                                                                                                                                                                                         CLIENT
                                               EXISTING CATCHMENT AREAS                                                                   R1                 0.013               100.0
                                                                                                                                                                                           ROWAN ANDERSON
                                                                             FRACTION                                                     R2                 0.013               100.0
                                     CATCHMENT            AREA (Ha)                                                                                                                      PROJECT
                                                                          IMPERVIOUS (%)
                                                                                                                                          R3                 0.013               100.0     53 - 55 DOONELLA STREET
                                          R1                      0.017             100.0
                                                                                                                                          R4                 0.013               100.0     TEWANTIN
                                          R2                      0.024             100.0
                                                                                                                                          C1                  0.011               75.9
                                          C1                      0.048               7.1                                                                                                TITLE
                                                                                                                                          C2                 0.016                70.1
                                          C2                      0.041              23.0                                                                                                  STORMWATER CATCHMENT
                                                                                                                                          C3                 0.026                22.9
                                          E1                      0.003              69.4                                                                                                  PLAN
                                                                                                                                          C4                 0.025                30.2
                                          E2                      0.006              50.6
                                                                                                                                          E1                 0.003                69.4
                                                                                                                                                                                         PROJECT NO.      DRAWING NO.    STATUS
                                                                                                                                          E2                 0.006                50.6    20210038         C20           MCU
                                                                                                                                                                                         DRAWN            DESIGNED       SCALE         ISSUE

                                                                                                                                                                                             BRP            BRP             NTS         B
Log in to download the original file

Attachment 1 - Stormwater Management Plan.pdf · 5.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.