Original source · versioned page text
Attachment H - Bushfire Management Plan v3
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe proposed development is not on a reticulated water supply. Water is collected on site by way of rainwater tanks, there are also 2 large dams located to the immediate west of the buildings of the site, associated with the site entry. It is also understood a bore water system is in place to supply the site with water, and a series (i.e. 2-3) large (i.e. ≥22,500L) water tanks toward the eastern extent of the site, adjacent the proposed ‘annex for single meditation’. Consequently, available water is considered to be sufficient to support fire-fighting in the event of a bushfire emergency. To support access to and a suitable volume of water for bushfire fighting, it is recommended that clear access to the dam water storage on the west of the site, be maintained, and hardstand provided where necessary to accommodate a medium rigid fire truck. In addition, tank storage on site is to be accessible for fire-fighting with male 50mm camlock connectors installed on one of proposed tanks to the west of the site, with a dedicated water supply of 10,000L at this location. 4.0 Recommendations and Conclusions This report details the assessment of Bushfire Hazard and risk mitigation measures acting on the proposed development, with consideration to the requirements of: the Queensland State Government Single State Planning Policy - Part E (SPP 2017); the Noosa Plan 2017, Division 9 – Natural Hazards Overlays Code; and the Australian Standard (AS 3959- 2009) - Construction of buildings in bushfire prone areas. This assessment has confirmed vegetation posing a Medium Potential Bushfire Hazard to the proposed development is present in all directions (Refer Section 2.2). These vegetation communities have the potential to accumulate moderate fuel loads and subsequently present a potential Bushfire Hazard to the proposed development. It is noted however that the setback to potentially hazardous vegetation to the immediate west, is considered to be >50m due to infrastructure, dams and other associated fragmentation and managed landscapes. N.B. Vegetation within the existing development footprint has been classified as having a Low Potential Bushfire Hazard, due to its managed nature and low fuel load potential, all-be-it within a Potential Impact Buffer area. Potentially hazardous vegetation is present on and adjacent the site, fire runs are considered to be limited in length, extent, width and fuel load potential to the north and south, but relatively in-tact to the east and to a lesser extent to the west. Consequently, in favourable conditions fire runs are considered viable to connect a bushfire (i.e. Wildfire) to the subject site. However, it is noted this hazard is not considered extreme or unmanageable given the existing development footprint and associated low potential hazard, lack of bushfire impacts to date, and establishment of appropriate setbacks for the proposed development. The following Bushfire Risk Mitigation Measures, as detailed above, are considered appropriate to substantially mitigate the Bushfire Hazard acting on the proposed development: 8 May 2019 35 Rules Road, Pomona - Bushfire Management Plan V3 Page 25 www.wollemi-eco.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.