Original source · versioned page text
Delegated Report - Code - Planning RAL21 0030
Author Consultant Planner Development Assessment APPLICATION DETAILS Application No. RAL21/0030 Applicant 64 Gateway Drive Pty Ltd TTE Proposal Reconfiguring a Lot - Industrial Properly Made Date 1 December 2021 Information Request Date 17 December 2021 Information Response Date 17 December 2021 Decision Due Date 11 February 2022 Report Completed Date 7 February 2022 Report Reviewed By Nadine Gorton PROPERTY DETAILS Property Address 64 Gateway Dr Noosaville Qld 4566 RP Description Lot 13 SP 170295 Land Area 12350m² Existing Use of Land Vacant Low Impact Industry development under construction (stage 1) STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Low Impact Industry Environmental Management and Conservation Precinct Gateways Drive West Makers Precinct Local Plan Area Noosaville Local Plan Area Overlays N/A Assessment Type Code PROPOSAL The application seeks approval for a Reconfiguring a Lot – 1 into 3 industrial lots. The proposal is for a staged subdivision of the site with a building format plan that creates the first stage (industrial units), common property and a balance lot. The second stage subdivides the initial balance lot into industrial units, common property and a balance lot. The third stage subdivides the last balance lot into factory units and common property. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Staging Plans site details Background 132007.738 - On July 2008 Council approved a Development Permit for Material Change of Use for Industrial Business Type 1 – Warehouse and Industrial Business Type 2. 132007.738.01 – On 9 April 2013 Council approved an extension to relevant period 132007.738.02 – On 14 June 2016 Council approved an extension to relevant period 132007.738.04 - On 24 June 2019, council approved changes to the approval which among many changes permitted the development to be constructed in 3 stages (see figure 3). Figure 3 – Staging Plan approved as part of the Change approval MCU19/0081 – On 19 September 2019 Council refused a development application for 16 Ancillary dwelling units MCU19/0081 – On 16 July 2021 Appeal No. D176 of 2019 the Court approved the application subject to conditions The approved Master Plan layout of the development site is provided in Figure 4 below. Figure 4 – Approved layout Master Plan. Site Description The subject site has an area of 12350m² and has a frontage of 80m to the Gateway Drive cul-de-sac head. The site is largely cleared of vegetation with the exception of vegetation secured in a vegetation covenant in the north-eastern section of the site. Surrounding Land Uses The site adjoins Multiple dwellings to the west and dwelling houses to the south west. To the north and the east is Lake Doonella Park and to the south, industry uses. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Low Impact Industry Zone Code; Noosaville Local Plan Code; Reconfiguring a Lot Code. The subject site is located in Noosaville and is zoned Low Impact Industry. The proposal is code assessable and is required to follow a code assessable application process. The application has been found to generally comply with all applicable statutory instruments. The pertinent issues arising out of the assessment are discussed below: Criteria Planning Scheme Proposal Complies Site Area Minimum 1000m2 Proposed Lot 1 Stage 1 – 5209m2 Lot 2 Stage 2 - 4571m2 Lot 3 Stage 3 – 2572m2 Yes Width Minimum 20m Proposed Lot 1 Stage 1 – 27m Lot 2 Stage 2 – 35m Lot 3 Stage 3 – 42m Yes The proposal complies with the requirements of the Reconfiguring a Lot code. The proposal results in lots that are of a size and dimension that is appropriate for their intended use and is responsive to the higher order approval and site constraints (ie vegetation covenant). The staging reflects the staging of the associated higher order approval and creates a layered scheme where each lot forms part of the original scheme. cONSULTATION Referral Agencies Internal Council Referrals The application was forwarded to the Engineering Coordinator, Development Assessment for review who confirmed the proposal reflected the relevant approvals and recommended inclusion of a number of conditions. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No RAL21/0030 for a Reconfiguring a Lot - Industrial situated at 64 Gateway Dr Noosaville and described as Lot 13 SP 170295, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: RAL21/0030 Street address: 64 Gateway Dr Noosaville Qld 4566 Real property description: Lot 13 SP 170295 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Reconfiguring a Lot - Industrial CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions Must Be Complied With Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for compliance assessment. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date SP316631 - Plan of Lots 24-42,900 & Common Property (Stage 1 Plan) 17.12.21 Proposed SP331064 - Plan of Lots 10 -23 & Common Property (Stage 2 Plan) 17.12.21 Proposed SP331066 - Plan of Lots 1-9 & Common Property (Stage 3 Plan) 17.12.21 All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. Currency Period This development approval lapses if the use has not happened by 10 February 2026, unless an application to extend the currency period is approved by Council. Prior to sealing for each stage all conditions of this Development Approval, and Development Approvals 132007.738 and OPW19/0203 and any subsequent approved changes, and any associated operational works approvals, as relevant to each particular stage must be completed and accepted by Council. For completeness this includes at a minimum completing the following works to the reasonable satisfaction of Council prior to sealing of the plan of survey for each stage: Any road access and infrastructure services required to service the particular stage are constructed with that stage; All landscaping works required for the particular stage are completed; All car parking required for the particular stage are complete; Final building certification is provided for each building for the particular stage; Payment of Infrastructure Contributions and Charges for the particular stage Services Reticulated electricity and telecommunication services must be provided to each lot in accordance with the standards and requirements of the relevant service provider. An underground connection to reticulated water and sewerage must be provided to each lot in accordance with the standards and requirements of Northern SEQ Distributor– Retailer Authority (Unitywater). Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction for the relevant stage. Bio Retention Basins Prior to the sealing of the plan of survey for the first stage a Schedule of Maintenance Costs for all activities undertaken to maintain the bio retention basins in accordance with the most current version of Healthy Waterways Bio Retention Basin Maintaining Vegetated Stormwater Assets Guidelines must be provided to Council. The schedule shall include records of actual costs of maintenance work undertaken. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority. Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 4 of 6 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image2.png (image text)] 900 ‘ X R 7144 m2 Balance Lot 9910'55* 2 > Gon sig Wi 11115'5q" 4#:267° CP SPIB9445 Emt sf SPI70295° Emt R. SP170295 [Attachment: image3.png (image text)] } UOISJaA 17 WO 4 Two Cont? Store, ete Billting CovB \ ‘SPSI6631 SP327872 ‘SP5I6631 SPI89445 Emt S. SPI70295 Emt R. EmtC SPI70295 SPIO754! 100 - EmtA —_— SP2I6079 SPI70294 EmtrR SP2/6079 /4 [Attachment: image4.png (image text)] PARK 502 cP SPI70295 SPISI674 epee 189°10'55" 23209 CovB \ ‘SPSI6631 rl EmtB SP327872 223 : suaise Stage 1 cP 57189445 SPSIE6S! Emt S. (SP170295 EmtR Emt C SPI70295 ‘SPIO754/ was (00 Emt A -T —_— SP2I6079 ‘SP170294 EmtrR SP216079 /4 ‘SP107541 [Attachment: image6.png (image text)] [MASTER PLAN - LEVEL 3W3HOS SAIL ALINQWWOD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.