PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 17 JUNE 2014
Units 4 & 5
Perspectives - Units 4 & 5, prepared by Hinton Steel N.D
Frames
A.01.2 I Ground Floor, prepared by Hinton Steel Frames 20-03-14
A.01.3 I First Floor (annotated), prepared by Hinton Steel 20-03-14
Frames
A.01.4 I Elevations, prepared by Hinton Steel Frames 20-03-14
A.01.5 I Elevations, prepared by Hinton Steel Frames 20-03-14
Units 6 & 7
Perspectives - Units 6 & 7, prepared by Hinton Steel N.D
Frames
A.01.2 H Ground Floor, prepared by Hinton Steel Frames 20-03-14
A.01.3 H First Floor, prepared by Hinton Steel Frames 20-03-14
A.01.4 H Elevations, prepared by Hinton Steel Frames 20-03-14
A.01.5 H Elevations, prepared by Hinton Steel Frames 20-03-14
Units 8 & 9
Perspectives - Units 8 & 9, prepared by Hinton Steel N.D
Frames
A.01.2 J Ground Floor, prepared by Hinton Steel Frames 20-03-14
A.01.3 J First Floor, prepared by Hinton Steel Frames 20-03-14
A.01.4 J Elevations, prepared by Hinton Steel Frames 20-03-14
A.01.5 J Elevations, prepared by Hinton Steel Frames 20-03-14
Building Height
3. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground surface and 2 storeys.
4. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the buildings do not exceed the maximum height requirement of this Decision
Notice.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Page 6 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.