Skip to the record
Beware of cheap imitations.

Council archive · source document

H Swqmp · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

MUSIC Model: Mitigated




MUSIC Results
Date: 19/12/2014
By: IP

Description                                                               Pollutant Load (kg/year)
                                                               TSS          TP              TN          GP
Developed Site Only (Without Mitigation)                      17600        52.7             370         3170
WQOs (Percentage Reduction)                                   80%          60%              45%         90%
Load Reduction Target                                         14080        31.62           166.5        2853
Developed Site plus External Catchment (Without Mitigation)   24400        65.5             426         3430
Developed Site plus External Catchment (With Mitigation)      10300        32.7             255          0
Load Retention Achieved                                       14100        32.8             171         3430
Load Retention Achieved as % of Developed Site Load           80.1%        62%             46.2%        108%
Water Quality Objective Achieved (SPP 4/10)                    YES          YES             YES         YES




Site Only no mitigation                                       Source      Residual       Reduction
Flow (ML/yr)                                                     144.00       144.00                0
Peak Flow (m3/s)                                                   0.88         5.86           -570.4
Total Suspended Solids (kg/yr)                                 17600.00     17600.00                0
Total Phosphorus (kg/yr)                                          52.70        52.70                0
Total Nitrogen (kg/yr)                                           370.00       370.00                0
Gross Pollutants (kg/yr)                                        3170.00      3170.00                0

Site + External Catchment+mitigations                         Source      Residual       Reduction
Flow (ML/yr)                                                     172.00       165.00            3.90
Peak Flow (m3/s)                                                   0.88         5.73         -555.40
Total Suspended Solids (kg/yr)                                 24400.00     10300.00           57.70
Total Phosphorus (kg/yr)                                          65.50        32.70           50.00
Total Nitrogen (kg/yr)                                           426.00       255.00           40.20
Gross Pollutants (kg/yr)                                        3430.00         0.00          100.00

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

H SWQMP.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.