Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
MUSIC Model: Mitigated
MUSIC Results
Date: 19/12/2014
By: IP
Description Pollutant Load (kg/year)
TSS TP TN GP
Developed Site Only (Without Mitigation) 17600 52.7 370 3170
WQOs (Percentage Reduction) 80% 60% 45% 90%
Load Reduction Target 14080 31.62 166.5 2853
Developed Site plus External Catchment (Without Mitigation) 24400 65.5 426 3430
Developed Site plus External Catchment (With Mitigation) 10300 32.7 255 0
Load Retention Achieved 14100 32.8 171 3430
Load Retention Achieved as % of Developed Site Load 80.1% 62% 46.2% 108%
Water Quality Objective Achieved (SPP 4/10) YES YES YES YES
Site Only no mitigation Source Residual Reduction
Flow (ML/yr) 144.00 144.00 0
Peak Flow (m3/s) 0.88 5.86 -570.4
Total Suspended Solids (kg/yr) 17600.00 17600.00 0
Total Phosphorus (kg/yr) 52.70 52.70 0
Total Nitrogen (kg/yr) 370.00 370.00 0
Gross Pollutants (kg/yr) 3170.00 3170.00 0
Site + External Catchment+mitigations Source Residual Reduction
Flow (ML/yr) 172.00 165.00 3.90
Peak Flow (m3/s) 0.88 5.73 -555.40
Total Suspended Solids (kg/yr) 24400.00 10300.00 57.70
Total Phosphorus (kg/yr) 65.50 32.70 50.00
Total Nitrogen (kg/yr) 426.00 255.00 40.20
Gross Pollutants (kg/yr) 3430.00 0.00 100.00
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
H SWQMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.