                                                                                                  CALIBRE CONSULTING




1 INTRODUCTION
Calibre Consulting (QLD) Pty Ltd (formerly Brown Consulting) has been commissioned by Palm Lake Resort to prepare a
“Concept Stormwater Quality Management Plan” to support the permissible change application for a retirement
community development located on Trading Post Road Cooroy. The development comprises of Independent Living Units
(ILUs), an Aged Care Facility and associated community facilities, refer to Palm Lake Resort’s Master Plan provided in
Appendix A for the development layout.

It is noted that the report is to be provided for the current site DA under the Noosa Shire Council (NSC), Council
Application Reference, 2007/2398 dated 16 January 2014.

1.1       OBJECTIVE
The objective of this report is to provide a Stormwater Quality Management Plan for the development. This is consistent
with the Stormwater Quality Conditions in the Noosa Shire Council (NSC) Negotiated Decisions Notice (16 January
2014). The objectives of the analyses undertaken is to:

   Update the stormwater quality management strategy under current local guidelines; and meet Water Quality
    Objectives (WQOs) under the State Planning Policy 2014 (SPP 2014).

It is noted that this report does not address stormwater quantity, flooding or peak flow control. Stormwater detention
strategy and volumes are as per Brown consulting Report No. B07056-02A dated June 2008 and consistent with NDN
Condition 66.

1.2       SCOPE
The scope of works to achieve the abovementioned objectives are outlined below.

   Review and update stormwater quality management strategy to current legislation and guidelines;
   Update past modelling to current standards and recent modelling software packages; and
   Resize control devices to achieve required WQO’s.
In addition to the above, an assessment of waterway stability and frequent flow management requirements under SEQ
Regional Plan Guidelines No.7 (2009) have also been provided.




B14158.W-01A | COOROY RETIREMENT VILLAGE| PALM LAKE RESORTS                                                              |1

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

H SWQMP.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.