Council archive · source document
H Swqmp · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
CALIBRE CONSULTING 2.2 TOPOGRAPHY AND SITE DRAINAGE The site is located on the eastern side of a north-south ridge line upon which a railway corridor lies. The site therefore falls from the western boundary with Cooroy Connection Road to the eastern boundary with Trading Post Road and the neighbouring eastern lot. The highest point on the site is near the intersection of Cooroy Connection Road and Pearsons Road at RL 111 m AHD. The lowest point is at the northern end of the site between the existing northern dam and eastern boundary at approximately RL 98 m AHD. Stormwater runoff from external areas, including part of the railway corridor and Cooroy Connection Road, discharge to the site at two locations. Runoff drains through existing gullies from each of these locations. The gullies are referred to as ‘central gully’ and ‘southern gully’. The average grade of the central gully is approximately 1.8% and the southern gully is approximately 3.5%, as measured from the western boundary to the eastern boundary. Each gully leads to existing dams on the eastern side of the site. Both gullies discharge across the eastern boundary to neighbouring rural lots. The dams are referred to as ‘central dam’ and ‘southern dam’. At the northern end of the site there is a third existing dam, referred to as ‘northern dam’. B14158.W-01A | COOROY RETIREMENT COMMUNITY| PALM LAKE RESORTS |3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
H SWQMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.