Council archive · source document
000A88A4.13A.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
¢ Cardnoa
. RABK
ts 4 pe A en
UP SPR
: y Bio-Retention System
Lake
Bio-Retention System
Bio-Filtration Medium
- Approx 150mm Topsoil Planted with Native Species of Local Provenance
o - Non-woven geotextile filter fabric
~ Approx 450 mm free-draining drainage media
~ Perforated Plastic Drainage Pipes Discharging to lake Resort
Kerb formed with
boulders and
broken channel
road pavement
. ee Sere Cris Ro TT E, Bio-filtration system set
<hr Ue .
Approx 500 below road pavement
Discharge to lake
Figure 8
Typical Filter Bio-Filtration System in the West Visitor Precinct
PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003
£A7296-03\Repori\FINAL REPORT - 18Sepi03.doc Commercial in Confidence
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.13A.tifRelated documentApplication case desk ↗
About this file
- File size
- 50 KB (small file)
- File type
- TIF
No other editions are linked here.