Original source · versioned page text
ORDINARY MEETING MINUTES 18 DECEMBER 2025 · Attachment 1 - 2025-12-18 Ordinary Meeting Minutes
ORDINARY MEETING MINUTES 18 DECEMBER 2025
8.3 DENISE PHIPPS
QUESTION 1
Can Council please explain in detail how this "recreationally focused pathway" will address
core community needs detailed in feedback in 2021 to Council's walking and cycling strategy,
especially those aimed at improving safe connectivity, genuine cycling safety, every day
usage, reduced traffic congestion and lower emissions?
RESPONSE PROVIDED BY SHAUN WALSH, DIRECTOR INFRASTRUCTURE
Thank you Mrs Phipps for the question. The Active Street directly responds to the core
community needs identified in the 2021 Walking and Cycling Strategy feedback, particularly
around safety, everyday use, connectivity, congestion and emissions reduction. The project
delivers a safe, continuous link between key destinations including homes, beaches, parks,
bus stops, schools and the Peregian Village. By creating a low-speed, low-stress street
environment with traffic calming, safer crossings, clear priority for people walking and riding,
and a dedicated pathway for less-confident users, it provides genuine cycling safety rather
than the narrow on-road shoulders or unsafe mixed-traffic environments residents identified
as concerns. This kind of safe, local street corridor supports everyday trips - to school, the
beach, local shops and bus stops - rather than being limited to recreational use. The Coastal
Pathway Study and Liveability feedback showed strong demand for short, local, safe walking
and cycling routes that reduce reliance on cars. The Active Street directly meets this need. By
encouraging more people to walk or ride for short local journeys, the project also contributes
to reduced local traffic, fewer short car trips, and consequently lower transport emissions,
aligning with the community’s stated priorities and Council’s long-term transport and
sustainability goals. In short, the Active Street improves safety, creates everyday
connectivity, encourages mode shift away from cars, and supports lower congestion and
emissions - exactly the outcomes the community asked for.
QUESTION 2
Will Council halt the current ill-conceived, unproven and unwanted Active Street project
planning, consult with all impacted residents and, based on feedback, proceed with route and
design changes that address local community needs and do not compromise local residential
character, amenity and safety as requested in the petition presented before council and
signed by over 140 Local Residents and rate payers?
RESPONSE PROVIDED BY SHAUN WALSH, DIRECTOR INFRASTRUCTURE
Council has received diverse feedback about the proposal. As well as the petition, other
requests include residents seeking supply of a footpath, resolution of parking problems,
concerns for speeding vehicles, as well as advocacy from stakeholder seeking safer cycling
routes, all of which this project seeks to address. Council is committed to listening and working
with the community. Council has made changes based on feedback during the preliminary
design phase and will continue to consult with all interested residents and stakeholders as
the project progresses. Council has planned additional information sessions including
information pop up and a walking tour in the locality in the New Year and will send information
out in the near future. Council looks forward to ongoing dialogue through upcoming
communication opportunities.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original