Attachment D- Construction Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Construction Management Plan
(CMP)
Proposed Residential Dwelling
20 Park Crescent, Sunshine Beach
Queensland, 4567
Prepared For: J & S Douglas
Document: AG-200841-CMP-C-01
Revision: 0
Date: 18 February 2021
Document Control
Revision Date Details Prepared Checked Approved
0 18/02/21 Original Issue GM LS LS
P 07 3186 8700
E [email protected]
W arcosgroup.com.au
A Unit 9/80 Sixth Avenue, Maroochydore QLD 4558
PO BOX 851, Moffat Beach, QLD, 4551
Page 1 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 8 pages
Page 2
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Contents
Introduction..................................................................................................................... 3
CMP Scope ............................................................................................................................................ 3
Site Location & Description ............................................................................................................ 3
Proposed Works .................................................................................................................................. 3
Precedence ............................................................................................................................................ 4
Interface with other project plans and processes .................................................................. 4
Construction Management ............................................................................................ 4
Approach................................................................................................................................................ 4
Approvals ............................................................................................................................................... 4
Site security ........................................................................................................................................... 5
Public / Worker safety ....................................................................................................................... 5
Construction Methodology ............................................................................................ 5
Demolition and excavation ............................................................................................................. 5
Traffic Management........................................................................................................................... 5
Erosion & Sediment Control (ESC) ............................................................................................... 5
Program .................................................................................................................................................. 5
Substructure Works ........................................................................................................................... 5
In-ground Services ............................................................................................................................. 5
Structure ................................................................................................................................................. 5
Facade ..................................................................................................................................................... 6
Landscaping .......................................................................................................................................... 6
Page 2 of 9
Page 3
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Introduction
This Construction Management Plan (CMP) has been developed to describe how the project
management team shall implement and conduct its allocated site management responsibilities
during the construction phase of the residential dwelling at 20 Park Crescent, Sunshine Beach. The
fundamental aim of this plan is to ensure all construction is properly facilitated, integrated, and
coordinated to deliver certainty to the objectives of the project.
This CMP is intended to outline general site specific construction risks, and should be used in
conjunction with the builders methodology and site specific requirements to manage safety and the
environment.
CMP Scope
This plan provides a holistic approach that:
advises how the project management team will comply with the requirements of the
construction for the site;
defines the project objectives and targets of particular relevance to the construction phase;
describes constraints specific to the construction phase and the project in general; and
describes the process for the identification and control of risks specific to the construction
phase;
Site Location & Description
Summary of site location, description, specific features:
Figure 1: Site Location
The site area is 588m2, with levels falling from the property frontage to the rear over approx. 11m.
There are residential properties on either side and vegetated coastline to the rear.
Proposed Works
The proposed works require the construction of a 3-storey residential house and a sloping site
outlooking Sunshine Beach. The preliminary Concept Drawings provided by Teeland Architects (Project
2001), outline that there is to be a below ground room and 2 floors above ground. Construction
materials appear to be industry standard and a mix between a concrete structure and timber finishing.
Page 3 of 9
Page 4
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
There is no major road or services upgrades external to the site, and the works appear to be contained
to normal residential building works. Demolition of the existing house and some vegetation will be
required prior to construction of the new house.
Precedence
Where ambiguity is detected between local and state government processes and requirements in
this CMP and the former will take precedence.
Interface with other project plans and processes
The construction management plan forms part of an integrated set of management plans and should
be read in conjunction with these other plans.
Construction Management
Approach
The major external constraints on the project are:
Access to site (only available from the street frontage);
Residnetial buildings on either side of the site;
Steep sloping site;
Undertaking works with minimal impact on neighbours;
Upon commencement, the project team's immediate tasks will be to:
Locate site specific facilities for all workers;
Undertake a survey of the site and complete a dilapidation report of surrounding properties
(if required) and assets;
Confirm the locations of existing services and obtain all necessary permits and licences and
approvals;
Arrange for the installation of temporary services – power, water and sewer to service the
site works and the amenities.
Approvals
Development approval is required for the works covering the excavation, basement and construction
works. We foresee that the development approval will contain conditions that certain reports will
need to be completed, submitted and approved before works can commence. Some of these reports
needing approval will most likely be:
Construction Management Plan
Erosion and Sediment Control
Geotechnical Slope Stability Assessment
Prior to commencing temporary modification of traffic arrangements, further approvals will be
required from Council including but not limited to:
Building Design Approval
Landscape Operational Works
All approvals will be required prior to construction commencing on the site.
Page 4 of 9
Page 5
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Site security
The site will be secured using appropriate fences and/or hoardings. All visitors to the site will be
required to report to the site office, and will be appropriately inducted and registered in a site
attendance log book.
Public / Worker safety
All site staff and subcontractors will be required to complete a site-specific induction before
commencing work on site. The induction will cover aspects relating to safety and amenity, including
access, emergency evacuation procedures, location of first aid facilities, location of amenities, site
hours, material handling, noise and dust management and environmental management. Prior to
commencing works on site, all subcontractors will be required to submit a project specific work
health safety and environmental management plan.
Construction Methodology
Demolition and excavation
Demolition and bulk excavation works will be completed prior to building works commencing on the
site.
Traffic Management
TMP's will be submitted to Council for approval prior to implementation. The frontage of the site
currently contains no footpath. Pedestrian access has been and will continue to be, via the verge.
Pedestrian access will not be affected by the works, during or after the works are completed.
Erosion & Sediment Control (ESC)
Protection of existing drainage lines through the construction site will be maintained through
compliance with Preliminary Sediment & Erosion Control Plan and Details (attached separately Civil
Consulting drawings (attached separately). These drawings are preliminary only and will be finalised
with input from the civil contractor and with input from a CPESC.
Program
Upon appointment of the building contractor, a works schedule and program will be provided to
the supervising engineer/client.
Substructure Works
It is envisaged that substructure works will incorporate construction of pad footings for building
columns and footings for structural wall support. Ones the site is setup- building foundations will be
cast, in-ground services installed and concrete walls poured on site as per the Structural design
(when supplied).
In-ground Services
During substructure works in-ground services installation will take place across the site. These works
will be programmed and co-ordinated to provide safe and efficient access for all trades. In-ground
services include stormwater, sanitary drainage, water mains, electrical services.
Structure
The structure will need to be erected via mobile cranes and/or personnel working from elevated
working platforms. Concrete pumping will need to be provided by a boom and poured within stages.
The roofing sheeting will also need to be craned onto the roof and manually split and carried into
Page 5 of 9
Page 6
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
place. Roofing will require safety netting installed over roof purlins, inspected by competent person
and signed off prior to roof lift.
Facade
The facade will be erected as soon as practical to commence waterproofing floors so that finishes and
fit out can commence. The roof embellishments will commence when the structure is complete. These
works be completed to the facade to complete the water tightness of the building.
Landscaping
It is envisaged that landscaping works are to be undertaken as soon as practically possible to allow
for establishment down the batter and management of erosion and sedinemtn control.
Page 6 of 9
Page 7
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Table 1: Construction Management
Air Quality Noise Management Vibration Control On-site Machinery Storage & Handling of Waste Management Visual Impact Site Security &
Management Servicing & Dangerous Goods On- Management Protection of
Maintenance Site Employees and the
Public
Issue Increased windborne Public noise nuisance from Vibration damage to Potential for spillage or Potential for spillage or Appropriate disposal of all Loss of visual amenity due Unauthorised access to
sediment loads during the construction vehicles and neighbouring structures. leakage of leakage of construction site waste. to construction, machinery the site leading to
construction phase. equipment. Nuisance. chemical/petroleum chemical/petroleum and/or equipment. vandalism, theft or
Worker health and safety. products and regulated products and regulated personal injury.
wastes to waters. wastes to waters.
Objective To reduce construction To undertake all reasonable To ensure ground To minimise the effect of To minimise the risk of To take all reasonable and To undertake construction To limit access to the
impacts on air (Quality and and practicable measures vibrations do not cause on-site machinery health hazards caused by practicable steps to reduce using all reasonable and construction site for
to help minimise to prevent or minimise damage to adjacent maintenance. the storage and transport and recycle waste during practicable measures to authorised personal
inconvenience to noise nuisance to buildings or cause To undertake all of dangerous goods. the construction phase minimise impact on visual during works hours only.
neighbouring properties neighbouring properties annoyance to nearby reasonable and practical To undertake all and to dispose of it in an amenity.
residents properties measures to minimise reasonable and practical appropriate manner.
contamination of land and measures to minimise
waters. contamination of land and
waters
Performance Standard construction Standard construction Standard construction No release of All dangerous goods to be Absence of waste and Minimal adverse visual No unauthorised access
hours shall be limited to hours shall be limited to 7 hours shall be limited to 7 contaminants to land or stored, handled and litter in the construction impact. to the construction site.
7.00 am to 5.00 pm am to 6 pm Mondays to am to 5 pm Mondays to water. bunded, according to site, access road and No excessive complaints.
Mondays to Saturdays Saturdays. Saturdays. Avoid any adverse effects Australian Standards, buffers.
unless otherwise authorised No unreasonable noise Vibration is to comply with on the construction site including AS2508, AS1678, No complaints.
by council. releases. AS2436 or MRS 51 or due to the maintenance AS1940, and AS2931.
No works to be carried out In the absence of equivalent standard. and servicing of No release of
on a Sunday or public quantitative monitoring No excessive complaints machinery. contaminants to land and
holidays. Dust plumes during the construction from neighbouring water.
created from the phase, noise levels are to residences
construction site and/or be controlled to accord No unreasonable
haulage of materials are to with accepted industry and vibrations
be eliminated no regulatory requirements
complaints from
neighbours
Control Prior to commencement of Prior to commencement of Prior to commencement of A bunded service area is Dangerous goods shall be Designate a waste Rubbish and waste to be The nominated point on
construction, neighbouring construction, neighbouring construction, neighbouring required for maintenance stored separately in collection area on- site collected from site. the plan.
Measures
residents and emergency residents and emergency residents and emergency and servicing -significant bunded areas not that does not receive a Surplus construction Barricades and safety
services shall be notified in services shall be notified in services shall be notified in vehicle maintenance shall assessable to unqualified substantial amount of material to be promptly fencing shall be erected
writing (by letter drop of writing (by letter drop of writing by letter drop of be conducted off-site at persons without runoff from upland areas removed from the around the site and
the construction period, the construction period, the construction period, appropriate facilities. appropriate training in its and does not drain directly construction site. adjacent to public
designated working hours designated working hours designed working hours Light maintenance may be handling and first aid to a water body. access ways. The site
Vegetation disturbance to
and contacts regarding and contacts regarding and contacts regarding undertaken on-site in the procedures. Ensure regular collection access is to be gated.
be minimised
complaints of excessive air complaints of excessive complaints of excessive bunded service area. Chemical data, handling of on-site waste. Generally, construction
quality deterioration. noise. vibration. and safety sheets for all
The contractor is to Disposal of waste activates to be
Vegetative ground covers Adjacent residences are to Use construction provide suitable access to dangerous goods will be collection bins is to be fenced/hoarded from
are to be maintained where be advised of any works to techniques that minimise surfacing for all-weather kept in the site office. clearly marked adjacent properties.
possible. be conducted out of the the need for blasting, rock purposes. Only necessary quantities "conventional waste", The construction site
Activities are to only be standard construction breaking and pile driving. of chemicals, fuels and oils "recyclable" and
Safe handling techniques compound is to be
conducted during suitable hours. Undertake geotechnical should be kept on the "regulated waste". Ensure
and required refuelling. locked at all times
weather conditions. All construction staff are to investigation as necessary construction site at any that all containers are outside of work hours.
Waste oils are to be
A water truck ur spray have adequate noise to predict vibration effects time. fitted with lids.
collected and transported The site shall be
apparatus is to be provided protection as per of construction techniques. Equipment is to be Regulated wastes shall be
to recyclers or designated appropriately
on site when required. workplace health and Undertake activities likely available in fuel storage sealed in an appropriate
disposal sites. maintained to provide a
safety. to cause vibration during areas and in vehicles to licensed to receive such
Exposed areas such as Servicing of plant and safe work environment
cleared areas and All plant and machinery normal construction hours. contain and clean up any waste. for all personal, visitors
equipment should be
stockpiles, are to be used during construction spills that may occur. and the general public.
watered and kept damp in must be fitted with exhaust
Page 7 of 9
Page 8
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Air Quality Noise Management Vibration Control On-site Machinery Storage & Handling of Waste Management Visual Impact Site Security &
Management Servicing & Dangerous Goods On- Management Protection of
Maintenance Site Employees and the
Public
order to minimise erosion silences or noise undertaken outside of Release any clean Schedule waste collection Appropriate warning
or the potential for dust suppression equipment, normal construction hours. stormwater accumulated is required to prevent the signs shall be erected
creation must be in good operating in temporary bunded containers from overfilling. for the work force and
Vehicle speed is to be conoition and meet areas. the general public to
limited on site to minimise emission standards. highlight hazardous
dust generation Haulage routes shall avoid activities within and
residential areas and use around the site
Trucks entering or exiting
dedicated routes roads including: excavation:
the site shall have their
where possible. demolition: the use of
loads covered
explosives power tools
All construction vehicles exposure to high noise
exiting site shall pass emissions.
through a wheel wash
Strict housekeeping
down and/or drive over a
shall apply to all entries
shake down grid which will
used for site access or
be located at the site
egress, including entry
entry/exit
to site sheds and
Haulage routes shall avoid employees facilities.
residential areas and use
sealed roads where
possible
Machinery shall be fitted
dust filters all equipment
and vehicles are to meet
relevant emission
standards.
Maintenance of wind
breaks and barriers where
possible stockpiles heights
are to be kept to
manageable heights for
dust and erosion control
purposes
Protection of long term soil
stock piles with
revegetation,
watering/moisture or hydro
mulching where practicable
Revegetate as soon as
possible following
construction
Responsibility The contractor holds The contractor holds The contractor holds The contractor holds The contractor holds The contractor holds The contractor holds The contractor is
responsibility for the site. responsibility for the site. responsibility for the site. responsibility for the site. responsibility for the site. responsibility for the site responsibility for responsible for the
The contractor is The contractor is the site designated site
responsible for public responsible for public compound security
notification via a letter notification via a letter fencing.
drop. drop.
Monitoring The contractor shall A complaints register to be The contractor is The contractor is The contractor is Daily visual inspections of Regular inspections for Daily visual inspections
conduct daily visual maintained. responsible for frequent responsible for daily visual responsible fur daily visual the site are to be unreasonable of the site will be
inspections of the site fur All genuine noise inspections of the site inspections of the site. inspections df the site. conducted. visual impacts. undertaken for the
dust plumes. a complaint complaints shall be during impact works. regular inspections will be a complaint register is to adequacy of site
register is to be maintained investigated and assessed undertaken of all be maintained. security.
to determine if the noise is temporary chemical and
unreasonable. Such
Page 8 of 9
Page 9
ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Air Quality Noise Management Vibration Control On-site Machinery Storage & Handling of Waste Management Visual Impact Site Security &
Management Servicing & Dangerous Goods On- Management Protection of
Maintenance Site Employees and the
Public
investigations may require petroleum product
noise monitoring to storage areas for leakages.
determine if a problem of
breach exists.
Corrective Corrective actions will Unreasonable noise caused Should complaints arise, The contractor shall If damaged goods are Prompt delegation of Visually offensive Installation of increased
include a review of existing by machinery is to be measures shall be taken by ensure on-site machinery spilt, the contractor shall clean up works. components of security measures
Actions
control measures for remedied by appropriate the contractor to modify is stored within the secure ensure that the area is Increased vigilance. construction should be required.
inadequacies. repairs and a maintenance the offending equipment designated compound isolated and minimised. identified and if
should complaints arise, schedule review. or modify construction after working hours. Petroleum or chemical possible modified in
the contractor shall ensure The relevant activity may practices to ensure The contractor shall spillages are to be consultation with
measures are taken to require modification or vibrations are within ensure any unauthorised immediately, cleaned up complaint.
modify the offending relocation. relevant guidelines. maintenance is ceased with adsorbent material.
equipment or modify Specific machinery may immediately and moved Absorbent materials used
construction practices to require an alteration to its off-site. for clean up or waste
reduce dust levels within hours of operation. The contractor shall dangerous goods are to
relevant guidelines ensure any area damaged be placed and sealed in an
Corrective actions will
include a review of existing by hydrocarbons or appropriate container
control measures for hazardous chemicals is marked "regulated waste"
inadequacies. fenced, excavated and and consigned to a waste
removed from site to a contractor licensed to
In the event that a non-
designated dumping area receive such waste for
conformance has occurred
and the area re- disposal at an approved
as a result of poor work
established. facility.
practices, personnel on-site
will be made aware of the The damaged area is to be
problem and informed of re-established.
acceptable work practices.
Reporting Weekly reporting by the Weekly reporting by the Weekly reporting by the Weekly reporting by the Weekly reporting by the Weekly reporting by the Weekly reporting by the Weekly reporting by the
principal contractor to the principal contractor to the principal contractor to the principal contractor to the principal contractor to the principal contractor to the principal contractor to the principal contractor to
consultant covering the consultant covering the consultant covering the consultant covering the consultant covering the consultant covering the consultant covering the the consultant covering
effectiveness of the effectiveness of the effectiveness of the effectiveness of the effectiveness of the effectiveness of the effectiveness of the the effectiveness of the
management system and management system and management system and management system and management system and management system and management system and management system
noting any corrective noting any corrective noting any corrective noting any corrective noting any corrective noting any corrective noting any corrective and noting any
actions taken. actions taken. actions taken. actions taken. actions taken. actions taken. actions taken. corrective actions taken.
Page 9 of 9