Attachment D- Construction Management Plan

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                      ABN 51 640 311 842
                                                                                                OFFICES
                                                                    Sunshine Coast | Brisbane | Gold Coast




    Construction Management Plan
                (CMP)

                        Proposed Residential Dwelling

                   20 Park Crescent, Sunshine Beach
                          Queensland, 4567



Prepared For:           J & S Douglas
Document:               AG-200841-CMP-C-01
Revision:               0
Date:                   18 February 2021




Document Control
Revision    Date            Details                 Prepared   Checked               Approved
0           18/02/21        Original Issue          GM         LS                    LS




P   07 3186 8700

E   [email protected]

W   arcosgroup.com.au

A   Unit 9/80 Sixth Avenue, Maroochydore QLD 4558

    PO BOX 851, Moffat Beach, QLD, 4551




                                                                                          Page 1 of 9
Log in to download the original file

Attachment D- Construction Management Plan.pdf · 670 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 pages

Page 2

                                                                                                                                              ABN 51 640 311 842
                                                                                                                                                        OFFICES
                                                                                                                           Sunshine Coast | Brisbane | Gold Coast




Contents
  Introduction..................................................................................................................... 3
        CMP Scope ............................................................................................................................................ 3
        Site Location & Description ............................................................................................................ 3
        Proposed Works .................................................................................................................................. 3
        Precedence ............................................................................................................................................ 4
        Interface with other project plans and processes .................................................................. 4
  Construction Management ............................................................................................ 4
        Approach................................................................................................................................................ 4
        Approvals ............................................................................................................................................... 4
        Site security ........................................................................................................................................... 5
        Public / Worker safety ....................................................................................................................... 5
  Construction Methodology ............................................................................................ 5
        Demolition and excavation ............................................................................................................. 5
        Traffic Management........................................................................................................................... 5
        Erosion & Sediment Control (ESC) ............................................................................................... 5
        Program .................................................................................................................................................. 5
        Substructure Works ........................................................................................................................... 5
        In-ground Services ............................................................................................................................. 5
        Structure ................................................................................................................................................. 5
        Facade ..................................................................................................................................................... 6
        Landscaping .......................................................................................................................................... 6




                                                                                                                                                  Page 2 of 9

Page 3

                                                                                                 ABN 51 640 311 842
                                                                                                           OFFICES
                                                                               Sunshine Coast | Brisbane | Gold Coast




        Introduction
This Construction Management Plan (CMP) has been developed to describe how the project
management team shall implement and conduct its allocated site management responsibilities
during the construction phase of the residential dwelling at 20 Park Crescent, Sunshine Beach. The
fundamental aim of this plan is to ensure all construction is properly facilitated, integrated, and
coordinated to deliver certainty to the objectives of the project.
This CMP is intended to outline general site specific construction risks, and should be used in
conjunction with the builders methodology and site specific requirements to manage safety and the
environment.
        CMP Scope
This plan provides a holistic approach that:
        advises how the project management team will comply with the requirements of the
         construction for the site;
        defines the project objectives and targets of particular relevance to the construction phase;
        describes constraints specific to the construction phase and the project in general; and
        describes the process for the identification and control of risks specific to the construction
         phase;
        Site Location & Description
Summary of site location, description, specific features:




Figure 1: Site Location
The site area is 588m2, with levels falling from the property frontage to the rear over approx. 11m.
There are residential properties on either side and vegetated coastline to the rear.
        Proposed Works
The proposed works require the construction of a 3-storey residential house and a sloping site
outlooking Sunshine Beach. The preliminary Concept Drawings provided by Teeland Architects (Project
2001), outline that there is to be a below ground room and 2 floors above ground. Construction
materials appear to be industry standard and a mix between a concrete structure and timber finishing.




                                                                                                    Page 3 of 9

Page 4

                                                                                                 ABN 51 640 311 842
                                                                                                           OFFICES
                                                                               Sunshine Coast | Brisbane | Gold Coast




There is no major road or services upgrades external to the site, and the works appear to be contained
to normal residential building works. Demolition of the existing house and some vegetation will be
required prior to construction of the new house.
        Precedence
Where ambiguity is detected between local and state government processes and requirements in
this CMP and the former will take precedence.
        Interface with other project plans and processes
The construction management plan forms part of an integrated set of management plans and should
be read in conjunction with these other plans.

        Construction Management
        Approach
The major external constraints on the project are:
        Access to site (only available from the street frontage);
        Residnetial buildings on either side of the site;
        Steep sloping site;
        Undertaking works with minimal impact on neighbours;
Upon commencement, the project team's immediate tasks will be to:
        Locate site specific facilities for all workers;
        Undertake a survey of the site and complete a dilapidation report of surrounding properties
         (if required) and assets;
        Confirm the locations of existing services and obtain all necessary permits and licences and
         approvals;
        Arrange for the installation of temporary services – power, water and sewer to service the
         site works and the amenities.
        Approvals
Development approval is required for the works covering the excavation, basement and construction
works. We foresee that the development approval will contain conditions that certain reports will
need to be completed, submitted and approved before works can commence. Some of these reports
needing approval will most likely be:
        Construction Management Plan
        Erosion and Sediment Control
        Geotechnical Slope Stability Assessment
Prior to commencing temporary modification of traffic arrangements, further approvals will be
required from Council including but not limited to:
        Building Design Approval
        Landscape Operational Works
All approvals will be required prior to construction commencing on the site.




                                                                                                    Page 4 of 9

Page 5

                                                                                                 ABN 51 640 311 842
                                                                                                           OFFICES
                                                                               Sunshine Coast | Brisbane | Gold Coast




        Site security
The site will be secured using appropriate fences and/or hoardings. All visitors to the site will be
required to report to the site office, and will be appropriately inducted and registered in a site
attendance log book.
        Public / Worker safety
All site staff and subcontractors will be required to complete a site-specific induction before
commencing work on site. The induction will cover aspects relating to safety and amenity, including
access, emergency evacuation procedures, location of first aid facilities, location of amenities, site
hours, material handling, noise and dust management and environmental management. Prior to
commencing works on site, all subcontractors will be required to submit a project specific work
health safety and environmental management plan.

        Construction Methodology
        Demolition and excavation
Demolition and bulk excavation works will be completed prior to building works commencing on the
site.
        Traffic Management
TMP's will be submitted to Council for approval prior to implementation. The frontage of the site
currently contains no footpath. Pedestrian access has been and will continue to be, via the verge.
Pedestrian access will not be affected by the works, during or after the works are completed.
        Erosion & Sediment Control (ESC)
Protection of existing drainage lines through the construction site will be maintained through
compliance with Preliminary Sediment & Erosion Control Plan and Details (attached separately Civil
Consulting drawings (attached separately). These drawings are preliminary only and will be finalised
with input from the civil contractor and with input from a CPESC.
        Program
Upon appointment of the building contractor, a works schedule and program will be provided to
the supervising engineer/client.
        Substructure Works
It is envisaged that substructure works will incorporate construction of pad footings for building
columns and footings for structural wall support. Ones the site is setup- building foundations will be
cast, in-ground services installed and concrete walls poured on site as per the Structural design
(when supplied).
        In-ground Services
During substructure works in-ground services installation will take place across the site. These works
will be programmed and co-ordinated to provide safe and efficient access for all trades. In-ground
services include stormwater, sanitary drainage, water mains, electrical services.
        Structure
The structure will need to be erected via mobile cranes and/or personnel working from elevated
working platforms. Concrete pumping will need to be provided by a boom and poured within stages.
The roofing sheeting will also need to be craned onto the roof and manually split and carried into



                                                                                                    Page 5 of 9

Page 6

                                                                                               ABN 51 640 311 842
                                                                                                         OFFICES
                                                                             Sunshine Coast | Brisbane | Gold Coast




place. Roofing will require safety netting installed over roof purlins, inspected by competent person
and signed off prior to roof lift.
        Facade
The facade will be erected as soon as practical to commence waterproofing floors so that finishes and
fit out can commence. The roof embellishments will commence when the structure is complete. These
works be completed to the facade to complete the water tightness of the building.
        Landscaping
It is envisaged that landscaping works are to be undertaken as soon as practically possible to allow
for establishment down the batter and management of erosion and sedinemtn control.




                                                                                                  Page 6 of 9

Page 7

                                                                                                                                                                                                                                                                                     ABN 51 640 311 842
                                                                                                                                                                                                                                                                                               OFFICES
                                                                                                                                                                                                                                                                   Sunshine Coast | Brisbane | Gold Coast




Table 1: Construction Management
                         Air Quality                     Noise Management                    Vibration Control                   On-site Machinery            Storage & Handling of                  Waste Management                     Visual Impact                      Site Security &
                        Management                                                                                                 Servicing &                Dangerous Goods On-                                                         Management                          Protection of
                                                                                                                                   Maintenance                         Site                                                                                                 Employees and the
                                                                                                                                                                                                                                                                                  Public
 Issue              Increased windborne                Public noise nuisance from         Vibration damage to                Potential for spillage or       Potential for spillage or          Appropriate disposal of all      Loss of visual amenity due          Unauthorised access to
                     sediment loads during the           construction vehicles and           neighbouring structures.            leakage of                       leakage of                          construction site waste.          to construction, machinery           the site leading to
                     construction phase.                 equipment.                         Nuisance.                           chemical/petroleum               chemical/petroleum                                                    and/or equipment.                    vandalism, theft or
                                                        Worker health and safety.                                               products and regulated           products and regulated                                                                                     personal injury.
                                                                                                                                 wastes to waters.                wastes to waters.

 Objective          To reduce construction             To undertake all reasonable        To ensure ground                   To minimise the effect of       To minimise the risk of            To take all reasonable and       To undertake construction           To limit access to the
                     impacts on air (Quality and         and practicable measures            vibrations do not cause             on-site machinery                health hazards caused by            practicable steps to reduce       using all reasonable and             construction site for
                     to help minimise                    to prevent or minimise              damage to adjacent                  maintenance.                     the storage and transport           and recycle waste during          practicable measures to              authorised personal
                     inconvenience to                    noise nuisance to                   buildings or cause                 To undertake all                 of dangerous goods.                 the construction phase            minimise impact on visual            during works hours only.
                     neighbouring properties             neighbouring properties             annoyance to nearby                 reasonable and practical        To undertake all                    and to dispose of it in an        amenity.
                                                                                             residents properties                measures to minimise             reasonable and practical            appropriate manner.
                                                                                                                                 contamination of land and        measures to minimise
                                                                                                                                 waters.                          contamination of land and
                                                                                                                                                                  waters

 Performance        Standard construction              Standard construction              Standard construction              No release of                   All dangerous goods to be          Absence of waste and             Minimal adverse visual              No unauthorised access
                     hours shall be limited to           hours shall be limited to 7         hours shall be limited to 7         contaminants to land or          stored, handled and                 litter in the construction        impact.                              to the construction site.
                     7.00 am to 5.00 pm                  am to 6 pm Mondays to               am to 5 pm Mondays to               water.                           bunded, according to                site, access road and            No excessive complaints.
                     Mondays to Saturdays                Saturdays.                          Saturdays.                         Avoid any adverse effects        Australian Standards,               buffers.
                     unless otherwise authorised        No unreasonable noise              Vibration is to comply with         on the construction site         including AS2508, AS1678,          No complaints.
                     by council.                         releases.                           AS2436 or MRS 51 or                 due to the maintenance           AS1940, and AS2931.
                    No works to be carried out         In the absence of                   equivalent standard.                and servicing of                No release of
                     on a Sunday or public               quantitative monitoring            No excessive complaints             machinery.                       contaminants to land and
                     holidays. Dust plumes               during the construction             from neighbouring                                                    water.
                     created from the                    phase, noise levels are to          residences
                     construction site and/or            be controlled to accord            No unreasonable
                     haulage of materials are to         with accepted industry and          vibrations
                     be eliminated no                    regulatory requirements
                     complaints from
                     neighbours

 Control            Prior to commencement of           Prior to commencement of           Prior to commencement of           A bunded service area is        Dangerous goods shall be           Designate a waste                Rubbish and waste to be             The nominated point on
                     construction, neighbouring          construction, neighbouring          construction, neighbouring          required for maintenance         stored separately in                collection area on- site          collected from site.                 the plan.
 Measures
                     residents and emergency             residents and emergency             residents and emergency             and servicing -significant       bunded areas not                    that does not receive a          Surplus construction                Barricades and safety
                     services shall be notified in       services shall be notified in       services shall be notified in       vehicle maintenance shall        assessable to unqualified           substantial amount of             material to be promptly              fencing shall be erected
                     writing (by letter drop of          writing (by letter drop of          writing by letter drop of           be conducted off-site at         persons without                     runoff from upland areas          removed from the                     around the site and
                     the construction period,            the construction period,            the construction period,            appropriate facilities.          appropriate training in its         and does not drain directly       construction site.                   adjacent to public
                     designated working hours            designated working hours            designed working hours             Light maintenance may be         handling and first aid              to a water body.                                                       access ways. The site
                                                                                                                                                                                                                                       Vegetation disturbance to
                     and contacts regarding              and contacts regarding              and contacts regarding              undertaken on-site in the        procedures.                        Ensure regular collection                                              access is to be gated.
                                                                                                                                                                                                                                        be minimised
                     complaints of excessive air         complaints of excessive             complaints of excessive             bunded service area.            Chemical data, handling             of on-site waste.                                                     Generally, construction
                     quality deterioration.              noise.                              vibration.                                                           and safety sheets for all
                                                                                                                                The contractor is to                                                Disposal of waste                                                      activates to be
                    Vegetative ground covers           Adjacent residences are to         Use construction                    provide suitable access to       dangerous goods will be             collection bins is to be                                               fenced/hoarded from
                     are to be maintained where          be advised of any works to          techniques that minimise            surfacing for all-weather        kept in the site office.            clearly marked                                                         adjacent properties.
                     possible.                           be conducted out of the             the need for blasting, rock         purposes.                       Only necessary quantities           "conventional waste",                                                 The construction site
                    Activities are to only be           standard construction               breaking and pile driving.                                           of chemicals, fuels and oils        "recyclable" and
                                                                                                                                Safe handling techniques                                                                                                                    compound is to be
                     conducted during suitable           hours.                             Undertake geotechnical                                               should be kept on the               "regulated waste". Ensure
                                                                                                                                 and required refuelling.                                                                                                                    locked at all times
                     weather conditions.                All construction staff are to       investigation as necessary                                           construction site at any            that all containers are                                                outside of work hours.
                                                                                                                                Waste oils are to be
                    A water truck ur spray              have adequate noise                 to predict vibration effects                                         time.                               fitted with lids.
                                                                                                                                 collected and transported                                                                                                                  The site shall be
                     apparatus is to be provided         protection as per                   of construction techniques.                                         Equipment is to be                 Regulated wastes shall be
                                                                                                                                 to recyclers or designated                                                                                                                  appropriately
                     on site when required.              workplace health and               Undertake activities likely                                          available in fuel storage           sealed in an appropriate
                                                                                                                                 disposal sites.                                                                                                                             maintained to provide a
                                                         safety.                             to cause vibration during                                            areas and in vehicles to            licensed to receive such
                    Exposed areas such as                                                                                      Servicing of plant and                                                                                                                      safe work environment
                     cleared areas and                  All plant and machinery             normal construction hours.                                           contain and clean up any            waste.                                                                 for all personal, visitors
                                                                                                                                 equipment should be
                     stockpiles, are to be               used during construction                                                                                 spills that may occur.                                                                                     and the general public.
                     watered and kept damp in            must be fitted with exhaust




                                                                                                                                                                                                                                                                                    Page 7 of 9

Page 8

                                                                                                                                                                                                                                                                                       ABN 51 640 311 842
                                                                                                                                                                                                                                                                                                 OFFICES
                                                                                                                                                                                                                                                                     Sunshine Coast | Brisbane | Gold Coast




                         Air Quality                    Noise Management                   Vibration Control                  On-site Machinery              Storage & Handling of                  Waste Management                      Visual Impact                        Site Security &
                        Management                                                                                              Servicing &                  Dangerous Goods On-                                                          Management                            Protection of
                                                                                                                                Maintenance                           Site                                                                                                    Employees and the
                                                                                                                                                                                                                                                                                    Public
                     order to minimise erosion          silences or noise                                                     undertaken outside of             Release any clean                  Schedule waste collection                                                Appropriate warning
                     or the potential for dust          suppression equipment,                                                normal construction hours.         stormwater accumulated              is required to prevent the                                                signs shall be erected
                     creation                           must be in good operating                                                                                in temporary bunded                 containers from overfilling.                                              for the work force and
                    Vehicle speed is to be             conoition and meet                                                                                       areas.                                                                                                        the general public to
                     limited on site to minimise        emission standards.                                                                                                                                                                                                    highlight hazardous
                     dust generation                   Haulage routes shall avoid                                                                                                                                                                                             activities within and
                                                        residential areas and use                                                                                                                                                                                              around the site
                    Trucks entering or exiting
                                                        dedicated routes roads                                                                                                                                                                                                 including: excavation:
                     the site shall have their
                                                        where possible.                                                                                                                                                                                                        demolition: the use of
                     loads covered
                                                                                                                                                                                                                                                                               explosives power tools
                    All construction vehicles                                                                                                                                                                                                                                 exposure to high noise
                     exiting site shall pass                                                                                                                                                                                                                                   emissions.
                     through a wheel wash
                                                                                                                                                                                                                                                                              Strict housekeeping
                     down and/or drive over a
                                                                                                                                                                                                                                                                               shall apply to all entries
                     shake down grid which will
                                                                                                                                                                                                                                                                               used for site access or
                     be located at the site
                                                                                                                                                                                                                                                                               egress, including entry
                     entry/exit
                                                                                                                                                                                                                                                                               to site sheds and
                    Haulage routes shall avoid                                                                                                                                                                                                                                employees facilities.
                     residential areas and use
                     sealed roads where
                     possible
                    Machinery shall be fitted
                     dust filters all equipment
                     and vehicles are to meet
                     relevant emission
                     standards.
                    Maintenance of wind
                     breaks and barriers where
                     possible stockpiles heights
                     are to be kept to
                     manageable heights for
                     dust and erosion control
                     purposes
                    Protection of long term soil
                     stock piles with
                     revegetation,
                     watering/moisture or hydro
                     mulching where practicable
                    Revegetate as soon as
                     possible following
                     construction

Responsibility      The contractor holds              The contractor holds              The contractor holds              The contractor holds              The contractor holds               The contractor holds              The contractor holds                  The contractor is
                     responsibility for the site.       responsibility for the site.       responsibility for the site.       responsibility for the site.       responsibility for the site.        responsibility for the site        responsibility for                     responsible for the
                    The contractor is                 The contractor is                                                                                                                                                               the site                               designated site
                     responsible for public             responsible for public                                                                                                                                                                                                 compound security
                     notification via a letter          notification via a letter                                                                                                                                                                                              fencing.
                     drop.                              drop.

Monitoring          The contractor shall              A complaints register to be       The contractor is                 The contractor is                 The contractor is                  Daily visual inspections of       Regular inspections for               Daily visual inspections
                     conduct daily visual               maintained.                        responsible for frequent           responsible for daily visual       responsible fur daily visual        the site are to be                 unreasonable                           of the site will be
                     inspections of the site fur       All genuine noise                  inspections of the site            inspections of the site.           inspections df the site.            conducted.                         visual impacts.                        undertaken for the
                     dust plumes. a complaint           complaints shall be                during impact works.                                                  regular inspections will be                                            a complaint register is to             adequacy of site
                     register is to be maintained       investigated and assessed                                                                                undertaken of all                                                      be maintained.                         security.
                                                        to determine if the noise is                                                                             temporary chemical and
                                                        unreasonable. Such




                                                                                                                                                                                                                                                                                      Page 8 of 9

Page 9

                                                                                                                                                                                                                                                                            ABN 51 640 311 842
                                                                                                                                                                                                                                                                                      OFFICES
                                                                                                                                                                                                                                                          Sunshine Coast | Brisbane | Gold Coast




                     Air Quality                    Noise Management                   Vibration Control                 On-site Machinery             Storage & Handling of                 Waste Management                     Visual Impact                     Site Security &
                    Management                                                                                             Servicing &                 Dangerous Goods On-                                                        Management                         Protection of
                                                                                                                           Maintenance                          Site                                                                                               Employees and the
                                                                                                                                                                                                                                                                         Public
                                                    investigations may require                                                                             petroleum product
                                                    noise monitoring to                                                                                    storage areas for leakages.
                                                    determine if a problem of
                                                    breach exists.

Corrective      Corrective actions will           Unreasonable noise caused         Should complaints arise,         The contractor shall             If damaged goods are              Prompt delegation of             Visually offensive                 Installation of increased
                 include a review of existing       by machinery is to be              measures shall be taken by        ensure on-site machinery          spilt, the contractor shall        clean up works.                   components of                       security measures
Actions
                 control measures for               remedied by appropriate            the contractor to modify          is stored within the secure       ensure that the area is           Increased vigilance.              construction should be              required.
                 inadequacies.                      repairs and a maintenance          the offending equipment           designated compound               isolated and minimised.                                              identified and if
                should complaints arise,           schedule review.                   or modify construction            after working hours.             Petroleum or chemical                                                possible modified in
                 the contractor shall ensure       The relevant activity may          practices to ensure              The contractor shall              spillages are to be                                                  consultation with
                 measures are taken to              require modification or            vibrations are within             ensure any unauthorised           immediately, cleaned up                                              complaint.
                 modify the offending               relocation.                        relevant guidelines.              maintenance is ceased             with adsorbent material.
                 equipment or modify               Specific machinery may                                               immediately and moved            Absorbent materials used
                 construction practices to          require an alteration to its                                         off-site.                         for clean up or waste
                 reduce dust levels within          hours of operation.                                                 The contractor shall              dangerous goods are to
                 relevant guidelines                                                                                     ensure any area damaged           be placed and sealed in an
                                                   Corrective actions will
                                                    include a review of existing                                         by hydrocarbons or                appropriate container
                                                    control measures for                                                 hazardous chemicals is            marked "regulated waste"
                                                    inadequacies.                                                        fenced, excavated and             and consigned to a waste
                                                                                                                         removed from site to a            contractor licensed to
                                                   In the event that a non-
                                                                                                                         designated dumping area           receive such waste for
                                                    conformance has occurred
                                                                                                                         and the area re-                  disposal at an approved
                                                    as a result of poor work
                                                                                                                         established.                      facility.
                                                    practices, personnel on-site
                                                    will be made aware of the                                                                             The damaged area is to be
                                                    problem and informed of                                                                                re-established.
                                                    acceptable work practices.

Reporting       Weekly reporting by the           Weekly reporting by the           Weekly reporting by the          Weekly reporting by the          Weekly reporting by the           Weekly reporting by the          Weekly reporting by the            Weekly reporting by the
                 principal contractor to the        principal contractor to the        principal contractor to the       principal contractor to the       principal contractor to the        principal contractor to the       principal contractor to the         principal contractor to
                 consultant covering the            consultant covering the            consultant covering the           consultant covering the           consultant covering the            consultant covering the           consultant covering the             the consultant covering
                 effectiveness of the               effectiveness of the               effectiveness of the              effectiveness of the              effectiveness of the               effectiveness of the              effectiveness of the                the effectiveness of the
                 management system and              management system and              management system and             management system and             management system and              management system and             management system and               management system
                 noting any corrective              noting any corrective              noting any corrective             noting any corrective             noting any corrective              noting any corrective             noting any corrective               and noting any
                 actions taken.                     actions taken.                     actions taken.                    actions taken.                    actions taken.                     actions taken.                    actions taken.                      corrective actions taken.




                                                                                                                                                                                                                                                                           Page 9 of 9

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.