Kenlynn Castaways Beach BMP
Attached to the e-mail Request for Negotiated Decision Notice REC16/0015.
8.0 Assessment of proposal against Division 9, Table 13.9 of The
Noosa Plan (September 2013)
Performance Criteria / Specific Probable / Acceptable Solutions
Outcome
8.1 (O4) The proposed use does not The use does not involve intensification, given that the number of
compromise the safety of people dwellings does not change. The use is sited on land that is
and property from bushfire. determined as medium risk, however mitigation measures
outlined in this BMP are applied, which reduce the risk
substantially below current levels.
8.2 (O5) Community Uses are able to The proposal does not involve Community Uses.
function effectively during and
immediately after bushfire events.
8.3 (O6) Public safety and the Solution 6.1 is applied in that hazardous materials are not
environment are not adversely manufactured or stored in bulk on the site.
affected by the detrimental impacts
of bushfire on hazardous materials
manufactured or stored in bulk.
8.4 (O7) Uses and works are sited, Solution S7.1 (a) is applied in that uses are sited on Lots greater
designed and constructed to – than 2500m² :
a) minimise the number of people i) in locations of lowest hazard within the Lot; and
and property subject to bushfire ii) to achieve setbacks greater than 10m, being mindful
risk; and of the environmental protection constraints of the
b) maximise the protection of site; and
people and property during the iii) 10m from any retained vegetation strips or small
passage of a fire front. areas of vegetation unless these are specifically of low
combustibility.
is made of the existing grassy area adjacent to the “Create”
building. Whilst setback from the property boundary is less than
10m, a non combustible radiant heat barrier shall be constructed
to reduce BAL exposure and complement construction levels,
asset protection zone (IPA on site) and landscaping.
8.5 (O8) An adequate water supply The use is in an municipal water service area but access to hydrant
is provided for fire fighting supply points is not available in accordance with AS2419.1-2005;
purposes. therefore a minimum volume of 5000litres of water shall be held
at each dwelling dedicated to firefighting use only; and that this
volume should be increased to 10 000litres per dwelling.
8.6 (O9) Firebreaks and fire access The limited site area (0.9677ha) and fragile nature of the foredune
tracks structure does not allow for or warrant this infrastructure.
Reconfiguring a Lot
8.7 (O10) The safety of people and The proposed Lots are located on land that is subject to Medium
property are maintained by Bushfire Hazard ; and
a) Locating housed sites and other Bushfire protection measures determined by this Plan are applied;
sensitive uses on that part of the and
land least affected by the bushfire The number of dwellings remains the same.
hazard; and
Report compiled by Bushfire Risk Reducers for Kenlynn Pty Ltd, August 2016 Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.