GEOTECHNICAL INVESTIGATION AND POOL SUPPORT DESIGN
195 An agreed assessment of the geotechnical investigation and proposed pool design is as follows:
Core Consultants Pty Ltd provided an undated geotechnical report on 24 September 2019 (included
in Attachment 2 to this joint report), which includes an assessment of Slope Stability in Chapter 6,
taking account of coastal erosion. The initially assumed coastal erosion extent was based on the
200 joint advice by NC and PP, which was for a cut to 60m west of the toe of the frontal dune (assumed
to align with the location of the highest astronomical tide). This cut was based on a 100 year storm
tide and 100 year wave condition with 0.3m sea level rise by 2050.
The analysis considered slope failure / erosion and slope reprofiling subsequent to the initial coastal
205 erosion cut, comprising upslope failure and lower slope failure, with and without micro‐piling to
support the proposed pool.
Case 3 results from the Core report show that, without piling, the pool is at risk of failure due to
failure of the slope to the east of the pool, following the assumed coastal erosion.
210 Case 4 shows that, with the 10m long micro‐piling, that an adequate factor of safety against failure is
achieved, and that the pool structure would remain in place. A consequence of the upper and lower
slope failure is that a near vertical erosion scar approximately 5m high would result immediately
adjacent to the pool.
215 The micro‐piles proposed on the eastern side of the pool are spaced at approximately 0.5m
minimum centres, with 49 piles in total distributed over two rows. An additional 7 micro‐piles are
proposed to support the western side of the pool.
Grout columns are also proposed between the micro‐piles to prevent sand flow, such that a
220 continuous wall is created under the eastern side of the pool.
RESPONSES TO KEY COASTAL ENGINEERING QUESTIONS
In terms of the 4 questions raised above, taking account of our investigations and the latest
225 geotechnical report by Core consultants, we provide the following agreed responses.
1. The extent of erosion associated with a storm event equivalent to a 100 year return period is
conservatively assessed as being a vertical cut extending 60m shoreward of the highest
astronomical cut line. This cut would result in subsequent upper and lower slope failures and
230 reprofiling. Without piling under the proposed pool, failure as shown in Case 3 could occur,
resulting in the collapse of the pool. With the proposed 10m deep, 56 micro‐pile
arrangement, the pool structure will remain intact, and the possible erosion scar profile as
shown in Core Consulting’s Case 4 could occur.
This addresses questions 1 to 3.
235 2. In relation to question 4, whilst some coffee rock has been encountered in geotechnical
investigations, in the orange zone shown on Core Consultants four Cases, there is insufficient
information to assume that a continuous and homogenous layer of coffee rock exists. Hence
the need for the deep micro‐piles.
6
006
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge RackemannRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.