Council archive · source document
24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge Rackemann · 51987.2951.01
CLIENT : MWL SHEET : 1 OF 1
CONTRACTOR : ALL-TECH
PROJECT : POOL
LOCATION : 42 Seaview Tce, Sunshine Beach
PROJECT No. : J000867
TEST: DCP1 TEST: DCP2
LOGGED: HO 19/07/2019 LOGGED: HO 19/07/2019
EASTING: 511335.0 m NORTHING: 7080106.0 m EASTING: 511362.0 m NORTHING: 7080098.0 m
Depth (m)
Depth (m)
Blows per 100 mm (AS 1289.6.3.2-1997) Blows per 100 mm (AS 1289.6.3.2-1997)
0 5 10 15 20 25 0 5 10 15 20 25
HW HW
HW
1 1
2 2
3 3
CORE 1.00 LIB.GLB Log IS DCP 3 PER PAGE J000867 BH1.GPJ <<DrawingFile>> 23/07/2019 10:06 10.0.000 Datgel Fence and Map Tool | Lib: DGDT-P 3.05.0 2016-01-20 Prj: DGDT-P 3.05.0 2016-01-20
20/70
4 4
5 5
6 6
Comments Comments
071
80
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge RackemannRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.