Council archive · source document
07/1252 - MCU - Detached House [As Published] · 132007.1252
-
FI
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 2.
Unless you answered “none of the above” lo 02,
the appfication triggers referral to the Depariment
oi Main Roads (OMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in other circumstances OMR will
be a concurrence agency.
Schedule 2 of the {P Regulation will assi¢1 you to
determine where OMR is an advice or
concurrence agency for the application.
Clearing vegetatiori
For more information refer fo Guide: 12.
Uniess you answered * none ‘Of the.abovet to Q3,-
. {he application iequires assessment by the’; .
a t Natural R os urge and. Vater. ”
ge 4 4 *
(NRW): ” .
fan agency other than’ NRW: is the ‘assessment
manager for tha- ‘application, NRWaisa!
concurrence agéncy,for the apolalor In telation
fo this malter. °:.. “a3 he ns
If you ticked 03fi) of (li, your apoiéation requires
referral to NRW for assessment reg ardléss. of”
whether vegetation clearing is proposed or nol.
J& .
ot hoo, Ae we be
IDAS Assessrnent Checklist, Version 20, 2 Apsit 2007
2. The application involves: (tick applicable box/es) a
(_] (i) development on land contiguous’ to a State controlled road and for -
(_] (a) material change of use assessable against the planning scheme;
J (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
» the total number of lots abutting the State-controlled road is not increased:
(_] (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) ebove)—
« associated with access to a State-controlled road; of
« for filling or excavation; or
« involving the redirection or intensification of site stomwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road,
C_] (ii) development on land not contiguous to a State- controlled road and -
L}{a) material change of use -
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
L_] (b) reconfiguring a Jot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule:
(-] {c} operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lof mentioned in (b) above)-
¢ assessable against the locat government's planning scheme; and
* mentioned in schedule 5 of the !P Regulation and exceeding the thresholds set by
that schedule.
NZ (ii) none of the above
3. The application involves: (tick applicable box/es)
LJ (i) material change of use -
{a) assessable against the planning scheme;
(b} on alot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ if there is no property map of assessable vegetation for the lot - remnant vegetation:
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger -compiele Part J of Form
LJ (ii) reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created: and
(d) where the size of any fot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a) for the clearing of native vegetation where the vegetation clearing i is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
[XI (iv) none of the above.
CT iii
Strategic port land
For more information refer to Guide 11.
If you ticked (i} - the relevant Port Authority is the
assessment manager for the application.
f you licked (ji) Queensland Transport is a
concurrence agency for the application.
4. The application invoives:
(_]{i) development on strategic port land as defined in the Transport infrastructure Act 1994 (Tl
Act) - complete Part { of Form 1
(_] (i) a material change of use that is inconsistent with the land use plan approved under the
T| Act for the strategic port land - complete Part | of Form 1
[S (iii} none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation ta mean land - if part of the land Is wilhin 100m of the Slate-controlled road; or \hat Is part of a future Stale-
controlled road.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1252 - MCU - Detached House [As Published]Related documentApplication case desk ↗
00154983.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.